Examples of Thermal Generating Station in a sentence
The Energy Plan directed Hydro to evaluate two options to deal with environmental concerns at the Holyrood Thermal Generating Station (HTGS).
The incumbent must perform all duties of the position in a safe manner with due regard to others working in the Charlottetown Thermal Generating Station and to Company equipment.
The minimum storage target is designed to show the minimum level of aggregate storage required such that if there was a repeat of Hydro’s critical dry sequence, or other less severe sequence,Hydro’s load can still be met through the use of the available hydraulic storage, maximum generation at Holyrood Thermal Generating Station, and non-firm imports.
As well, Hydro is closely monitoring national and international activity in this area.9.3 Holyrood Thermal Generating Station End-of-LifeUnits 1 and 2 of the HTGS were commissioned in 1971 and Unit 3 was commissioned in 1979.
Placement of the southern electrode in Conception Bay in the general vicinity of the Holyrood Thermal Generating Station would be acceptable from an electric field effects perspective, and this location would minimize the cost of the electrode line to the Soldiers Pond converter station.
In absence of the new CERC Terms and Conditions of Tariff Regulations, 2019-24 at the time of filing the application, GRIDCO has considered the norms of operation for Central Thermal Generating Station as per the existing CERC Tariff Regulations, 2014.
Various expenses, capital expenditures and Statement of Financial Position balances include amounts denominated in USD, particularly Hydro’s fuel purchases for the Holyrood Thermal Generating Station (HTGS).
The compensation should be equal to the variable cost of the Central Thermal Generating Station approved by the Commission for power purchase of GRIDCO situated at the margin of the merit order dispatch for that year.
The Board acknowledges that the 31 planned transition of the Holyrood Thermal Generating Station to synchronous condensing mode 32 has been delayed for a number of years as a result of the delay in the commissioning of the Muskrat 33 Falls Project, which is beyond Hydro’s control.
Power Engineers in the Charlottetown Thermal Generating Station and ECC System Operators will work on shift or days as required in accordance with Articles 8.01 and 8.02.