Technical Oversight definition

Technical Oversight means to look at, look after the technical aspect of an activity/function.

Examples of Technical Oversight in a sentence

  • The name of the Technical Oversight Representative, if one is designated, will be furnished the Contractor by the Battelle Contracts Representa- tive.B. The Battelle Technical Oversight Representative is au- thorized to receive information, conduct inspections of work in process and witness Contractor tests.

  • The Contractor’s progress and compliance with the technical requirements of this contract may be moni- tored for Battelle by a Technical Oversight Repre- sentative.

  • Technical Oversight through a special committee would be resorted to in multivendor cases where a complaint has been received and not for Single Vendor Cases and cases where only DPSU(s) / OFB are participating.

  • The Secretary may certify an electronic poll book following an examination of the poll book and receipt of a report prepared by the Voting System Technical Oversight Program (VSTOP), which is currently administered by the Bowen Center at Ball State University.

  • The Program Management and Technical Oversight Activity will complement the Transmission Lines and Substations Activities.

  • That Settlement Agreement is reaffirmed as part of this Stipulation and its terms are incorporated into this Stipulation, except that the provisions regarding continuing jurisdiction (¶ 4), groundwater monitoring, reporting, and the Technical Oversight Committee (¶¶ 7-20) are cancelled and superseded by the provisions of this Stipulation dealing with those issues.

  • Phase 2 of the Programme will allow any further changes to the existing regulatory and consumer protection regimes to be considered and put in place.

  • Work will be conducted with project oversight by the WisDOT Bureau of Structures and WHRP Structures Technical Oversight Committee (TOC).

  • Cooperation with the Technical Oversight Committee (TOC) and more generally all the Technical Committees (TC) is expected.

  • Staff Evaluation.(j) Oversight by Technical Oversight Committee (TOC), if required.(k) Commercial negotiations by Contract Negotiation Committee (CNC).(l) Approval of the Competent Financial Authority (CFA).(m) Award of contract/placing of Indents.(n) Post-Contract Management.

Related to Technical Oversight

  • Technical Direction means developing work statements, determining parameters, directing other Contractors' operations, or resolving technical controversies.

  • Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;

  • City’s Project Manager means the City’s employee, or his/her delegate, who is authorized in writing to deal with the Consultant on behalf of the City in connection with the Services, or to make decisions in connection with this Agreement;

  • Contractor Project Manager means the employee identified in a Statement of Work as the Contractor project manager.

  • Technical Contact shall have the meaning assigned to it in Section 4.2.

  • Project Management The individuals appointed by each Party cf. clause 4.1 in the Agreement.

  • Project Managers means the person at Developer responsible for the project management of Product and identified in Schedule 2;

  • Project Manager means the principal employee or agent of the Recipient having administrative authority over the Project designated in Appendix B pursuant to Section VI hereof, or authorized designee as per written notification to the Director.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • Technical Services means all services that are necessary to carry out individual, scattered site activities including but not limited to: (1) conducting initial inspections, (2) work write-up or project specification development, (3) cost estimate preparation, (4) construction supervision associated with activities that do not require an architect or engineer, (5) lead hazard reduction or lead abatement need determination and oversight, (6) lead hazard reduction or abatement carrying costs, (7) temporary relocation coordination, (8) financing costs such as security agreement preparation and recording or filing fees, (9) processing of individual applications for assistance, (10) income eligibility determination and verification, (11) value determination (new construction) or after rehabilitation value determination (existing structures), and (12) project-specific environmental clearance processes.

  • Manufacturing operation means a process in which materials are changed, converted, or transformed into a different state or form from which they previously existed and includes refining materials, assembling parts, and preparing raw materials and parts by mixing, measuring, blending, or otherwise committing such materials or parts to the manufacturing process. "Manufacturing operation" does not include packaging.

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Technical Bid means the bid submitted online through the electronic bidding platform, containing the documents as listed out in Clause 2.5.2 of this RFP;

  • Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Technical safeguards means the technology and the policy and procedures for its use that 27 protect electronic PHI and control access to it.

  • Technical Documentation means designs, reports, photographs, drawings, plans, specifications, computer software, surveys, calculations and other data, information and material collected, computed, drawn or produced, including computer print-outs.

  • CHIEF MECHANICAL ENGINEER means the Chief Mechanical Engineer of the Chennai Port Trust.

  • Technical standard means a document that specifies design, predicted performance and operation and maintenance specifications for a material, device or method.

  • Technical Standards means the technical standards set out in paragraph 2.4 of the Order Form;

  • Multiphase professional services contract means a contract for the providing of professional

  • Project Management Consultant means --------------Not Applicable --------------

  • Engineering means the application of scientific knowledge for the design, control, or use of building structures, equipment, or apparatus.

  • Clinical nurse specialist means a registered nurse with relevant post-basic qualifications and 12 months’ experience working in the clinical area of his/her specified post-basic qualification, or a minimum of four years’ post-basic registration experience, including three years’ experience in the relevant specialist field and who satisfies the local criteria.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;