Specified Material definition

Specified Material means stone including stone suitable for dimension stone, labradorite, chert, sand, gravel, clay, topsoil, soil, shale, marl, peat and peat xxxx when these substances are used for construction or agricultural purposes only;
Specified Material collectively and individually means those items of Material from time to time designated by the Board of Directors as being available for free use. The items of Specified Materials made available to some categories of Members as compared to others, shall be as from time to time designated by the Board of Directors. The use of all Material is governed by the terms of the current HL7 Policy Governing the Use of HL7 Standards and Other Intellectual Property ("HL7 IP Policy"). Unless otherwise legended, all Material is copyrighted by HL7 and protected by the Copyright Law of the United States and copyright provisions of various international treaties. Unauthorized use of Material is strictly prohibited. Any use, copying or distribution (either with or without a fee) of Material, or development, copying or distributions of derivative works, whether in fixed or electronic media, not specifically authorized below is strictly prohibited. The terms applicable to the access to and use of Material are as follows:
Specified Material means any material, substance, product or article specified in the Schedule;

Examples of Specified Material in a sentence

  • Rupees Australian Dollar --------------------------Euro--------------------------Japanese Yen--------------------------U.K. Pound--------------------------U.S. Dollars-------------------------- BC-1Appendix-C to Bid SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Notes: 1.

  • Rupees Australian Dollar --------------------------Euro--------------------------Japanese Yen--------------------------U.K. Pound--------------------------U.S. Dollars-------------------------- SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Notes: 1.

  • Rupees Australian Dollar --------------------------Euro--------------------------Japanese Yen--------------------------U.K. Pound--------------------------U.S. Dollars-------------------------- BC-1Appendix-C to Bid SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Source of Index Notes: 1.

  • Rupees Australian Dollar --------------------------Euro--------------------------Japanese Yen--------------------------U.K. Pound--------------------------U.S. Dollars--------------------------BC-1Appendix-C to Bid SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Source of Index Notes:NA1.

  • Rupees Australian Dollar --------------------------Euro--------------------------Japanese Yen--------------------------U.K. Pound--------------------------U.S. Dollars-------------------------- BC-1Appendix-C to Bid SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Source of Index Notes:NA1.

  • Rupees Australian Dollar --------------------------Euro--------------------------Japanese Yen--------------------------U.K. Pound--------------------------U.S. Dollars-------------------------- SCHEDULE OF SPECIFIED MATERIALSBC-1Appendix-C to BidFOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Source of Index Notes: 1.

  • Rupees Australian Dollar EuroJapanese YenU.K. PoundU.S. Dollars---------------------------------------------------------------------------------------------------------------------------------- BC-1Appendix-C to Bid SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Notes: 1.

  • SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Source of Index Notes: kinds1.

  • Rupees ----------------------------------------------------------------------------------------------------------------------------------Australian Dollar EuroJapanese YenU.K. PoundU.S. Dollars SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II‌ Item No.Description of Specified Material Notes: 1.

  • RupeesUnit of Currency Australian Dollar EuroJapanese YenU.K. PoundU.S. Dollars---------------------------------------------------------------------------------------------------------------------------------- BC-1Appendix-C to Bid SCHEDULE OF SPECIFIED MATERIALS FOR THE PURPOSE OF CLAUSE 70-COC PART-II Item No.Description of Specified Material Notes: 1.


More Definitions of Specified Material

Specified Material means any specified pests, plants, plant products or other objects requiring an authorisation within the meaning of this Regulation;
Specified Material means [ xxxxxxxxx ]
Specified Material means (A) any Third Party Product and (B) any collagen based product, intermediate, or finished material (including collagen components of the products of Cohesion Corporation) other than recombinant human collagen based products and materials (i) manufactured (commercially or by the Investigational Formulation Department) by Collagen prior to January 1, 1999 or (ii) for which Technologies initially submits a purchase order based upon Specifications mutually agreed to by the parties prior to January 1, 1999.

Related to Specified Material

  • Specified Materials means the basic materials required on the Site for the execution and completion of Works, which shall include fuel and lubricants; cement; aggregates; steel reinforcement; timber and gravel.

  • Adapted Material means material subject to Copyright and Similar Rights that is derived from or based upon the Licensed Material and in which the Licensed Material is translated, altered, arranged, transformed, or otherwise modified in a manner requiring permission under the Copyright and Similar Rights held by the Licensor. For purposes of this Public License, where the Licensed Material is a musical work, performance, or sound recording, Adapted Material is always produced where the Licensed Material is synched in timed relation with a moving image.

  • Licensed Material means the artistic or literary work, database, or other material to which the Licensor applied this Public License.

  • Received Material means records, software and other material, whether complete or not, that, as a result of this Agreement, are received by the Contractor or a Subcontractor from the Province or any other person;

  • Harvested Material means the grain or fodder from crops of the Licensed Varieties grown from Seed or Retained Seed.

  • Developed Materials means Materials created, made, or developed by Contractor or Subcontractors, either solely or jointly with the Judicial Branch Entities or JBE Contractors, in the course of providing the Work under this Agreement, and all Intellectual Property Rights therein and thereto, including, without limitation, (i) all work-in-process, data or information, (ii) all modifications, enhancements and derivative works made to Contractor Materials, and (iii) all Deliverables; provided, however, that Developed Materials do not include Contractor Materials.

  • Background Material means any pre-existing works in which the Intellectual Property Rights are owned by either Party, which have been prepared by that Party outside the scope of this Agreement or which were licensed from a third party by that Party.”

  • Produced Material means records, software and other material, whether complete or not, that, as a result of this Agreement, are produced or provided by the Contractor or a Subcontractor and includes the Incorporated Material;

  • Specified Matter means any Amendment of a Portfolio Investment that (a) reduces the principal amount of such Portfolio Investment, (b) reduces the rate of interest payable on such Portfolio Investment, (c) postpones the due date of any scheduled payment or distribution in respect of such Portfolio Investment, (d) alters the pro rata allocation or sharing of payments or distributions required by any related underlying instrument in a manner adverse to the Company, (e) releases any material guarantor of such Portfolio Investment from its obligations, (f) terminates or releases any lien on a material portion on the collateral securing such Portfolio Investment, (g) changes any of the provisions of any such underlying instrument specifying the number or percentage of lenders required to effect any of the foregoing or (h) materially changes any financial maintenance covenant.

  • Specified Equipment means the railway vehicles which the Train Operator is entitled to use in the provision of Services on the Network, as specified in paragraph 4 of Schedule 5;

  • Restricted materials means pesticides established as restricted materials under Title 3, California Code of Regulations, section 6400.

  • Dredged material means material that is excavated or dredged from surface waters.

  • Lost or missing licensed material means licensed material whose location is unknown. This definition includes licensed material that has been shipped but has not reached its planned destination and whose location cannot be readily traced in the transportation system.

  • Lithified earth material means all rock, including all naturally occurring and naturally formed aggregates or masses of minerals or small particles of older rock that formed by crystallization of magma or by induration of loose sediments. This term does not include man-made materials, such as fill, concrete, and asphalt, or unconsolidated earth materials, soil, or regolith lying at or near the earth surface.

  • Licensed Materials means any materials that Executive utilizes for the benefit of the Company (or any Subsidiary thereof), or delivers to the Company or the Company’s Customers, which (a) do not constitute Work Product, (b) are created by Executive or of which Executive is otherwise in lawful possession and (c) Executive may lawfully utilize for the benefit of, or distribute to, the Company or the Company’s Customers.

  • Input Material means all documents, information, representations, statements and materials provided by Customer or a third party on behalf of Customer, relating to the Services, including computer programs, data, logos, reports and specifications and inventories.

  • Custom Materials means Materials developed by the Supplier at the Procuring Entity's expense under the Contract and identified as such in Appendix 5 of the Contract Agreement and such other Materials as the parties may agree in writing to be Custom Materials. Custom Materials includes Materials created from Standard Materials.

  • specified work means so much of any of the authorised development as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property.

  • Project specific information means such part of the Instructions to Consultants used to reflect specific project and assignment conditions.

  • Recycled material means any material that would otherwise be a useless, unwanted or discarded material except for the fact that the material still has useful physical or chemical properties after serving a specific purpose and can, therefore, be reused or recycled.

  • Accelerator-produced material means any material made radioactive by a particle accelerator.

  • The Material/ Product means all the materials along with the accessories which the contractor is required to supply to the Bank under the Contract.

  • Activity Material means any Material, other than Reporting Material, created or developed by the Grantee as a result of the Activity and includes any Existing Material that is incorporated in or supplied with the Activity Material.

  • Nonconformance as used in this clause means a condition of any hardware, software, material, or service/workmanship in which one or more characteristics do not conform to requirements.

  • Fissile material means the radionuclides uranium-233, uranium-235, plutonium-239, and plutonium-241, or any combination of these radionuclides. "Fissile material" means the fissile nuclides themselves, not material containing fissile nuclides. Unirradiated natural uranium and depleted uranium and natural uranium or depleted uranium, that has been irradiated in thermal reactors only, are not included in this definition. Certain exclusions from fissile material controls are provided in 10 CFR 71.15.

  • Output Material means any Documents or other materials, and any data or other information provided by the Supplier relating to the Specified Service;