Separate Meter definition
Examples of Separate Meter in a sentence
Separate Meter Installations To establish and maintain a more identifiable and practical service to separate consumers, and to facilitate current and future water supply management, all new Class 1a and 2 buildings will be required to provide a separate water connection to each tenement unit.
The Company shall install and own the Separate Meter under Rule 11 and each owner or tenant of a unit shall apply for Service and be a Company Customer.
Landlord shall install any such Separate Meter at Landlord’s expense, except that Tenant shall reimburse Landlord (within thirty (30) days after invoice) for the costs of any such Separate Meter installed by Landlord following Tenant’s Overstandard Use (as defined below) of electricity or water for a period of two (2) consecutive months or four (4) months in any twelve (12) month period during the Term of this Lease.
Separate Meter shall be located as set out in the Information Memorandum.
ORCHARD HILLS: Residential Sewer Rate: $27.56 minimum first 2,000 gallons; $3.00 per thousand gallons thereafter.Residential Sewer Connection Fees: $500.00 Residential Non-User Monthly Sewer Fee: $23.56 IRRIGATION METERING: Connection Fee: $350.00Minimum Monthly Fee: $13.50 first 2,000 gallons and $2.50 per thousand gallon thereafter;Cut-on/Cut-off Fee: $25.00 each (Separate Meter Required with RPZ Backflow Prevention Device) Voting yes: Mr. Baker, Mr. Snead, Mr. Mathes, Mr. Vaughan and Mr. Huff.
Metering Set-UpMonthly ChargeEV Rate Separate Meter $4.95 $0033/kWh $014170/kWh other month for the EV Only $0.17564/kWh (June–Sept.) *Rates apply to single phase – secondary voltage use only.
If the Phase I Commencement Date occurs before Landlord shall install the Separate Meter, then Landlord shall make a reasonable estimate of Tenant’s and the adjoining tenant’s respective shares of electrical usage periodically, and xxxx Tenant on a monthly basis for its proportionate share accordingly (the “Alternative Billing”).
Such meters shall be installed at the expense of the user, and shall conform to the provisions of Subdivision 4, Section 21‐402, Maximum Separate Meter Charge.
The 9MP also hoped to increase opportunities for the private sector to participate in the development of the infrastructure and utilities division through the PFI.In the Tenth Malaysian Plan ("10MP"), the government reinforced its commitment to PPP and identified 52 high-impact PPP projects worth RM63 billion for implementation.
Separate Meter for Each ServiceThe Corporation will normally furnish a single meter at the point of connection to the member’s premises.