Project Bundle Import definition

Project Bundle Import fix for Mac bundles – top level query terms (“and” or “or”) came with only one operand (even if two or more are specified as required in the schema). • Model repair rule that removes orphan codings. • Fix display issue with total count of merged quotations in project merge. • Fix collect merge conflict unit test. • Make progress messages in survey import user friendlier. • Fix cancel in survey import. • Terminalserver info in sysrep & telemetry on startup. • Fix small issues with reverse geo coding. • Bugfix: Change path for EF model cache. • Catch errors when upgrading settings, rearranged gis-q-tooltip, catch twitter change account errors. • Update Aspose document converter and survey. • Add geo coding cache for reducing access to the open street mat geo server. • Speedup merging codes and links in Merge Project action. • Fix an issue with the step order in the Endnote import step. Catch IO exception when trying to access a referred file in the Endnote import. • Model repair rule for orphan links. • Edited messag etext for failed imports. Fixed gis tooltip, added warning to gis search when not connected. • Project Bundle Import: fixed crash on older (A7) bundles . • Bugfix: Negative width or height for rectangle in PDF exchange format from Mac project bundle. • Fix sanity check for deleted networks; Remove networks from groups when deleted. • Add address to geo location tool tip. • Fix numbering issue in merge project. • Fix issue with merging projects with Geo docs. • Add address search for Geo Docs. • Integrated Project-Auto-Repair into project loading. • Model integrity check rule for NetworkView corrected; Repair projects with orphan links. • Bug fix: Merge duplicating document and quotation numbers. • Fix Merge Quotation Unit tests. • Fix crash when resizing an invalid location. • Fix crash when quotation providers are not set in coding actions. • Fix crash when quotation providers do not provide quotations. • Fix numbering issue in document and quotations while merging projects. • List/Report: Stripping control characters on text content used for (list)report output.
Project Bundle Import avoid exception if given relation type is null or empty. • Report/Output: catching exception on report dispose/finish. • Fix for recursively closing a primary window. • Fix for broken unit tests. • When the last project closes, ATLAS.ti no longer closes but re-opens the Welcome Window. • Fix for SaveHtmlDocument. • CopyBundle (Legacy) Import: catching exception when retrieving bundle info – gives (embedded) message to the user instead. • Remove the current project from the project list in the merge back stage control. It makes no sense to merge a project into itself. . • Ask the user if the quotations coded by a code shall be deleted when the code is deleted. • Do not add target code to code groups of the merged codes when merging codes. • Fix an issue when dropping a code onto an invalid text quotation. • All Project Imports: ensure that GUIDs will only be used once for documents and quotations on ProjectBundle, Legacy and Mobile import. • Project Bundle Export: fixed time export issue (even if a explicit format was given, the separators were interpreted region-dependent).

Related to Project Bundle Import

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

  • Construction materials means any tangible personal property that will be

  • Manufacturing Facilities means facilities engaged in the

  • Compression Ignition Engine means an internal combustion engine with operating characteristics significantly similar to the theoretical diesel combustion cycle. The regulation of power by controlling fuel supply in lieu of a throttle is indicative of a compression ignition engine.