Production Testing definition

Production Testing means exploitation of prospecting and development xxxxx to specify data available and to obtain additional information on geological-and-physical accumulation characteristic, relation of hydrocarbons, productivity of xxxxx for projection of field development.
Production Testing means conducting a thorough check of the Deliverables to ensure that they perform or will perform in accordance with the Specifications.

Examples of Production Testing in a sentence

  • The maximum allowable unconditioned tensile strength shall be 1380 kPa (200 psi).” Production Testing.

  • The maximum allowable unconditioned tensile strength shall be 200 psi (1380 kPa).” Production Testing.

  • The minimum allowable FI shall be as follows:Minimum Flexibility Index (FI)HMA8.0SMA8.01/ Existing mix designs shall also meet the FI Criteria for verification testing.” Production Testing.

  • Initial Production Testing: The Contractor shall split and test the first two samples with the Department for comparison purposes regardless of whether a test strip is used.

  • The maximum allowable unconditioned tensile strength shall be 1380 kPa (200 psi).” Start-up and Production Testing.

  • Included are Type Testing, Production Testing, Commissioning Testing, and Periodic Testing.

  • Production tests are to be conducted in accordance with the applicable requirements of IMO Resolution MSC.81 (70), Part 2 and each item, batch, or lot be delivered with an LR Certificate of SOLAS Production Testing issued by the attending LR Surveyors following their witness of the tests.

  • Certified Interconnection Equipment shall not require further design testing or Production Testing, as specified by IEEE Standard 1547 Sections 5.1 and 5.2, or additional Interconnection Equipment modification to meet the requirements.

  • Contractor Production Testing Requirements for Asphalt Binder/Liquid Anti-Strip Blend: 1) The Contractor shall, on a daily basis, sample and test the asphalt binder/anti-strip blend.

  • A type of trim and design accepted when test- ed in a vertical configuration may be used in a horizontal configuration without further testing.(3) Production Testing.

Related to Production Testing

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • Test means such test as is prescribed by the particulars or considered necessary by the Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting under the direction of the Inspecting Officer;

  • Cannabis testing facility means an entity registered by

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • QA means Quality Assurance.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Production Operations means all operations conducted for the purpose of producing Petroleum from the Development Area after the commencement of production from the Development Area including the operation and maintenance of all necessary facilities therefor.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Manufacturing operation means a process in which materials are changed, converted, or transformed into a different state or form from which they previously existed and includes refining materials, assembling parts, and preparing raw materials and parts by mixing, measuring, blending, or otherwise committing such materials or parts to the manufacturing process. "Manufacturing operation" does not include packaging.

  • Quality Surveillance Engineer / Inspector means any person appointed by or on behalf of the Purchaser to inspect or carry out quality surveillance on supplies, stores or work under the Contract or any person deputed by the Quality Surveillance Engineer for the said purpose.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • The Works/Project means the works to be executed or done under this contract.

  • Nuclear fuel cycle-related research and development activities means those activities which are specifically related to any process or system development aspect of any of the following: - conversion of nuclear material, - enrichment of nuclear material, - nuclear fuel fabrication, - reactors, - critical facilities, - reprocessing of nuclear fuel, - processing (not including repackaging or conditioning not involving the separation of elements, for storage or disposal) of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.