Preliminary Design Concept definition

Preliminary Design Concept. As defined in Section 3.1.1.

Examples of Preliminary Design Concept in a sentence

  • Provide applicable Preliminary Design Concept Conference, schematic layout and Plans, Specifications and Estimate (PS&E) package checklists for use by the Engineer.

  • The Preliminary Design Concept shall describe the general scope and quality of the Building and shall identify those portions of the Building which will constitute the Premises initially leased to Tenant and the Expansion Spaces.

  • Such selection of Tenant's Architect and Landlord's Design Team (to the extent then identified), the establishment and agreement upon the Preliminary Design Concept and the establishment and agreement upon such preliminary Project Cost budget shall be made by the respective dates for each set forth in the progress schedule attached as Exhibit B hereto (the "Progress Schedule").

  • In connection therewith, Landlord shall cause Landlord's Architect to prepare schematic architectural plans, structural and engineering plans, elevations and building sections, and site plans for the Building based upon the Preliminary Design Concept ("Schematic Design Documents"), which shall mean a conceptual design of the Base Building Improvements illustrating the scale and relationship of the components of the Base Building Improvements.

  • Landlord and Tenant shall also mutually establish and agree upon (i) a preliminary design concept for the Building (the "Preliminary Design Concept"), which shall be based upon Tenant's program, outline building specifications, schedule requirements, and (ii) a preliminary hard and soft cost budget for the Base Building Improvements (the "preliminary Project Cost budget").

  • If despite the diligent and good faith efforts of Landlord and Tenant the parties are unable to mutually select Landlord's Architect, to establish a mutually acceptable Preliminary Design Concept and/or a mutually acceptable preliminary Project Cost budget by the applicable dates set forth in the Progress Schedule, either Landlord or Tenant may terminate this Lease upon thirty (30) days' prior written notice to the other party.

  • During such thirty (30) day period Landlord and Tenant shall use diligent and good faith efforts to select such Architect, establish such Preliminary Design Concept and/or preliminary Project Cost budget, as applicable, failing which this Lease shall terminate on the date set forth in such notice.

  • Landlord has developed and Tenant hereby approves the detailed base building description (the "Preliminary Design Concept") set forth or referenced in Exhibit B hereto for the Building and Premises describing in general terms the principal items of work and materials to be performed and supplied by Landlord.

  • For public meeting #2, HN will present the Preliminary Design Concept and associated draft cost estimate to the community (unless told otherwise).

  • This scope of services allows for up to 2 minor revisions of the Preliminary Design Concept Plan and Preliminary Cost Opinion.

Related to Preliminary Design Concept

  • Natural channel design concepts means the utilization of engineering analysis and fluvial geomorphic processes to create, rehabilitate, restore, or stabilize an open conveyance system for the purpose of creating or recreating a stream that conveys its bankfull storm event within its banks and allows larger flows to access its bankfull bench and its floodplain.

  • Preliminary Work means all work done in the concept and preparatory stages (including non-exhaustively design, artwork, colour matching).

  • Design Change is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Maximum design heat input means the ability of a unit to combust a stated maximum amount of fuel per hour on a steady state basis, as determined by the physical design and physical characteristics of the unit.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;