Low Impact Design definition

Low Impact Design means land development (or re-development) that works with nature to manage stormwater as close to its source as possible, such as minimizing impervious surfaces and treating stormwater as a resource rather than a waste product. Practices include bioretention facilities, rain gardens, vegetated rooftops, rain barrels, and permeable pavements, maintenance or restoration of a watershed's hydrologic and ecological functions.

Examples of Low Impact Design in a sentence

  • The City of Mountlake Terrace Survey Requirements Document (Exhibit C-1), the City of Mountlake Terrace Engineering Services Department CAD Standard (Exhibit C-2), the Mountlake Terrace Municipal Code, the current version of the Stormwater Management Manual for Western Washington, and the current version of the Low Impact Design manual will be used in the preparation and delivery of electronic files for transmission to the agency.

  • The preliminary stormwater design will utilize the Low Impact Design (LID) options discussed in the Central Oregon Stormwater Manual.

Related to Low Impact Design

  • Low Impact Development or “LID” means a site design strategy that maintains, mimics or replicates pre- development hydrology through the use of numerous site design principles and small-scale treatment practices distributed throughout a site to manage runoff volume and water quality at the source.

  • Project designer means any person who designs the following activities with respect to friable ACM in a facility: a response action other than a small-scale short-duration activity, a maintenance activity that disturbs friable ACM other than a small-scale short-duration maintenance activity, or a response action for a major fiber release episode and meets the certification requirements of this regulation.

  • System Impact Study means an assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights. “System Protection Facilities” shall refer to the equipment required to protect (i) the Transmission System, other delivery systems and/or other generating systems connected to the Transmission System from faults or other electrical disturbance occurring at or on the Customer Facility, and (ii) the Customer Facility from faults or other electrical system disturbance occurring on the Transmission System or on other delivery systems and/or other generating systems to which the Transmission System is directly or indirectly connected. System Protection Facilities shall include such protective and regulating devices as are identified in the Applicable Technical Requirements and Standards or that are required by Applicable Laws and Regulations or other Applicable Standards, or as are otherwise necessary to protect personnel and equipment and to minimize deleterious effects to the Transmission System arising from the Customer Facility.

  • low-vision means a condition where a person has any of the following conditions, namely:—

  • Project Implementation Manual or “PIM” means the manual to be adopted pursuant to Section 6.01 (c) of this Agreement for implementation of the Project, giving disbursement arrangements, performance indicators, terms of reference of staff and other administrative, financial and organizational arrangements, including a chapter on procurement procedures, and setting forth the criteria for the Subprojects, as hereinafter defined, as such manual may be amended from time to time with the prior agreement of the Association;