Issued for Construction definition

Issued for Construction means, as the term is commonly used in the construction industry, the final documents used for construction of the Premises.

Examples of Issued for Construction in a sentence

  • All submittals including Issued for Construction (IFC) drawings are required to be reviewed and accepted by the City Engineer prior to building permit issuance.

  • If Tenant desires to make any non-de minimis change, addition or alteration or desires to make any change, addition or alteration to any of the Building Systems after approval of the Issued for Construction Documents, Tenant shall prepare and submit to Landlord plans and specifications with respect to such change, addition or alteration.

  • The A/E shall issue documents stamped and dated "Issued for Construction" to the contractors.

  • Activities for each design phase (Concept, Schematic (30%), Design Development (60%) and Issued for Permit and Issued for Construction (100%) documents.

  • Another issue that arose, as the result of the Architect/Engineer's site visit to observe the partial start up, is that the subcontractors on-site appear to have been using the 100% CD set instead of the one Issued for Construction (IFC), hence several last minute RFIs. While the contractor is resolving this internally, completion of the work may be delayed and extend past the current contract expiration date.

  • The Contractor shall not perform any work without documents bearing Architect/Engineer's signed and dated "Issued for Construction" stamp.

  • Cost estimates may be generated at 30%, for long-lead material items, 60% level and at Issued for Construction level, of facility design based on the Interconnector’s estimated completion date accurate to +50% / -30%.

  • Issued for Construction August 20, 2015.• Town of Superior Town Center Lift Station Final Drawings Set 1 & Set 2 Rev 0.

  • H.49 ISSUED FOR CONSTRUCTION DRAWINGS AND SPECIFICATIONS‌ (a) The Work shall be performed using only drawings and specifications marked "Issued for Construction" (or equivalent) by Company.

  • It is advisable to observe these before they are buried or the red lines from the construction contractor will need to be relied upon.The “Record” of this inspection can be in the form of marking compliances and deviations on the Issued for Construction drawings, work instructions assembled from Standard Designs, or a separate document (for example).

Related to Issued for Construction

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Original construction ’ shall mean the first or initial construction

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • the Constitution means the Constitution of the Republic of South Africa, Act 108 of 1996

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Construction and demolition debris means and includes:

  • Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.

  • as constructed plans means as constructed plans as defined in the Building Code;

  • Foreign construction material means a construction material other than a domestic construction material.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Specially constructed vehicle means any vehicle that was not originally constructed under a

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Maximum design heat input means the ability of a unit to combust a stated maximum amount of fuel per hour on a steady state basis, as determined by the physical design and physical characteristics of the unit.