Firm XXX Energy definition

Firm XXX Energy or “FE”, has the meaning set forth in Section 3(k) of Exhibit D.
Firm XXX Energy or “FE”, has the meaning set forth in Section 3(k) of Exhibit D. “First Penalty Month” has the meaning set forth in Section 3(b) of Exhibit I.
Firm XXX Energy. “FE” has the meaning set forth in Section 3(k) of EXHIBIT F.

Related to Firm XXX Energy

  • renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and other such sources as approved by the MNRE;

  • Annual Energy Use means, (i) with respect to the first 5 years following the Effective Date, the annual electricity usage, expressed in kilowatt hours (“kWhs”), within the Party’s respective jurisdiction and (ii) with respect to the period after the fifth anniversary of the Effective Date, the annual electricity usage, expressed in kWhs, of accounts within a Party’s respective jurisdiction that are served by the Authority and (b) “Total Annual Energy” means the sum of all Parties’ Annual Energy Use. The initial values for Annual Energy use are designated in Exhibit C, and shall be adjusted annually as soon as reasonably practicable after January 1, but no later than March 1 of each year

  • Net energy metering means the difference between the kilowatt-hours consumed by a customer-generator and the kilowatt-hours generated by the customer- generator's facility over any time period determined as if measured by a single meter capable of registering the flow of electricity in two directions.

  • System with a single service connection means a system which supplies drinking water to consumers via a single service line.

  • Renewable Energy Source means an energy source that is not fossil carbon-based, non- renewable or radioactive, and may include solar, wind, biomass, geothermal, landfill gas, or wave, tidal and thermal ocean technologies, and includes a Certified Renewable Energy Source.

  • Short-rotation coppice means a specific management regime whereby the poles of trees are cut every one to two years and which is aimed at producing biomass for energy. It is exempt from the UK government timber procurement policy requirements and falls under agricultural regulation and supervision rather than forestry. The exemption only refers to short-rotation coppice, and not 'conventional' coppice which is forest management and therefore subject to the timber policy.

  • cogeneration means the simultaneous generation in one process of thermal energy and electrical or mechanical energy;

  • Real-time System Energy Price means the System Energy Price resulting from the Office of the Interconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.

  • Community support services means services authorized,

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Supply Pipe means any part of a service pipe which a water undertaker could not be, or have been required to lay under section 46 of the Water Industry Act 1991; and

  • Renewable energy means the grid quality electricity generated from renewable energy sources;

  • Spot Market Energy means energy bought or sold by Market Participants through the PJM Interchange Energy Market at System Energy Prices determined as specified in Operating Agreement, Schedule 1, section 2, and the parallel provisions of Tariff, Attachment K-Appendix, section 2.

  • Day-ahead System Energy Price means the System Energy Price resulting from the Day- ahead Energy Market.

  • Registrant Fax Ext 4321 Registrant Email: XXXXX@XXXXXXX.XXX Admin ID: 5372809-ERL Admin Name: EXAMPLE REGISTRANT ADMINISTRATIVE Admin Organization: EXAMPLE REGISTRANT ORGANIZATION Admin Street: 000 XXXXXXX XXXXXX Xxxxx Xxxx: ANYTOWN Admin State/Province: AP Admin Postal Code: A1A1A1 Admin Country: EX Admin Phone: +1.0000000000 Admin Phone Ext: 1234 Admin Fax: +1.5555551213 Admin Fax Ext: Admin Email: XXXXX@XXXXXXX.XXX Tech ID: 5372811-ERL Tech Name: EXAMPLE REGISTRAR TECHNICAL Tech Organization: EXAMPLE REGISTRAR LLC Tech Street: 000 XXXXXXX XXXXXX Xxxx Xxxx: ANYTOWN Tech State/Province: AP Tech Postal Code: A1A1A1 Tech Country: EX Tech Phone: +1.1235551234 Tech Phone Ext: 1234 Tech Fax: +1.5555551213 Tech Fax Ext: 93 Tech Email: XXXXX@XXXXXXX.XXX Name Server: NS01.EXAMPLEREGISTRAR.TLD Name Server: NS02.EXAMPLEREGISTRAR.TLD DNSSEC: signedDelegation DNSSEC: unsigned >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Registrar Data: Query format: whois “registrar Example Registrar, Inc.” Response format: Registrar Name: Example Registrar, Inc. Street: 0000 Xxxxxxxxx Xxx City: Marina del Rey State/Province: CA Postal Code: 90292 Country: US Phone Number: +1.0000000000 Fax Number: +1.3105551213 Email: xxxxxxxxx@xxxxxxx.xxx WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxx Registrar Phone Number: +1.3105551213 Fax Number: +1.3105551213 Email: xxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxxx Registrar Phone Number: +1.3105551214 Fax Number: +1.3105551213 Email: xxxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Technical Contact: Xxxx Geek Phone Number: +1.3105551215 Fax Number: +1.3105551216 Email: xxxxxxxx@xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Nameserver Data: Query format: whois “NS1.EXAMPLE.TLD”, whois “nameserver (nameserver name)”, or whois “nameserver (IP Address)” Response format: Server Name: NS1.EXAMPLE.TLD IP Address: 192.0.2.123 IP Address: 2001:0DB8::1 Registrar: Example Registrar, Inc. WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< The format of the following data fields: domain status, individual and organizational names, xxxxxxx, xxxxxx, xxxx, xxxxx/xxxxxxxx, postal code, country, telephone and fax numbers (the extension will be provided as a separate field as shown above), email addresses, date and times should conform to the mappings specified in EPP RFCs 5730-5734 so that the display of this information (or values return in WHOIS responses) can be uniformly processed and understood. In order to be compatible with ICANN’s common interface for WHOIS (InterNIC), WHOIS output shall be in the format outline above.

  • Annual Resource Price Adder means, for Delivery Years starting June 1, 2014 and ending May 31, 2017, an addition to the marginal value of Unforced Capacity and the Extended Summer Resource Price Adder as necessary to reflect the price of Annual Resources required to meet the applicable Minimum Annual Resource Requirement. Annual Revenue Rate:

  • Real-time Energy Market means the purchase or sale of energy and payment of Transmission Congestion Charges for quantity deviations from the Day-ahead Energy Market in the Operating Day.

  • Class II renewable energy means electric energy produced at a

  • ESMP or “Environmental and Social Management Plan” means with respect to each activity under the Project pursuant to which the ESMF requires it, a plan to be prepared by the Recipient pursuant to Section I.D.1 of Schedule 2 to this Agreement, in accordance with the provisions of the ESMF and approved by the Association, setting out measures to mitigate any adverse environmental and social impacts arising from such activities; and “ESMPs” means more than one ESMP.

  • Natural gas utility means an investor-owned business engaged in the sale and distribution of natural gas within this state whose rates are regulated by the commission.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Renewable Energy Standard means the minimum renewable energy capacity portfolio, if applicable, and the renewable energy credit portfolio required to be achieved under section 28 or former section 27.

  • Class I renewable energy means electric energy produced from

  • Standard Methods for the Examination of Water and Wastewater means the most recent edition of Standard Methods for the Examination of Water and Wastewater published jointly by the American Public Health Association, the American Waterworks Association and the Water Environment Federation;

  • Net Energy The total quantity of electric energy (measured in kilowatt hours) produced by the Facility over a given time period and delivered to the Point of Interconnection, as measured by the revenue meter. "Net Energy" the equivalent of "Actual Output."

  • Electric utility steam generating unit means any steam electric generating unit that is constructed for the purpose of supplying more than one-third of its potential electric output capacity and more than 25 MW electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility.