ENERGIZED OUTLET definition

ENERGIZED OUTLET means a connected point in an electrical wiring installation at which current is taken and a source of voltage is connected to supply utilization equipment.
ENERGIZED OUTLET means a connected point in an electrical wiring installation at which current is taken to supply utilization equipment.
ENERGIZED OUTLET means a connected point in an electrical wiring installation at which current is taken to supply utilization equipment, which includes a covered outlet box.

Related to ENERGIZED OUTLET

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Ethanol blended gasoline means the same as defined in section 214A.1.

  • Gathering lines means any pipeline, equipment, facility, or building used in the transportation of oil or gas during oil or gas production or gathering operations.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.