Demonstration Run definition
Examples of Demonstration Run in a sentence
The Supplier shall notify Amptech of the following events to be witnessed; PDR – Production Demonstration Run, Specific details of the PDR will be called out in CSR Addendum.
From time to time during the Demonstration Run, Chevron Research will estimate the length of the then current run of the First Charge and the length of the run immediately following the next regeneration of the First Charge.
Sulfur Sorbent--Chevron Research will provide the first charge of sulfur sorbent for use in the Demonstration Run.
Sulfur Control Catalysts--Chevron Research will provide the first charge of each of the sulfur control catalysts to be installed for both the cleanup phase and the Demonstration Run in the Licensed Unit.
The date on which the Licensed Unit first goes on stream shall be the startup date for the Demonstration Run unless otherwise agreed by Chevron Research and South Hampton.
Those process engineering services include preparing sulfur sorb▇▇ ▇▇▇ sulfur control catalyst reactor specifications, reviewing and evaluating existing Refinery equipment for suitability for the Demonstration Run and determining modifications that are necessary, preparing flow schemes for feed and product streams of the Licensed Unit, defining the plant configuration for the Demonstration Run, and preparing performance estimates.
Chevron Research's only liability, if any, respecting the Licensed Unit and/or the operation of it and/or the Demonstration Run, including but not limited to any breach of the foregoing representation or for any losses, damages, claims or demands of any nature arising out of work and services provided under this Agreement, to South Hampton and/or South Hampton's contractors and/or third parties shall be that set forth in Section 5.l(5)(b) above.
Routine operation--Chevron Research will make available engineering assistance for normal operations and for emergencies from the San Francisco area or from the Port Arth▇▇ ▇▇▇inery of Chevron U.S.A. Inc., as appropriate, for the Licensed Unit during the Demonstration Run.
Chevron Research will conduct or have conducted, at its expense, all standard laboratory tests and analyses appropriate to support the Demonstration Run.
Chevron Research will station or have stationed, at its expense, at least one engineer at the refinery during the first six weeks of the Demonstration Run covering plant cleanup, startup, and the initial phases of operation of the Licensed Unit.