Base Mapping definition

Base Mapping. Prepare topographic mapping in Civil 3D 2018 at a 1” = 20’ scale, 22”x34”. Topographic features will be depicted using accepted Mountain Waterworks standard symbols. Topographic features will be shown on the design plans to the extent that they are found or field located by the utility companies, such as fences, utility poles, surfacing, utilities, edge of pavement, face of curb, sidewalks, striped roadway centerline, guard rails, signal poles, signs, mail boxes, face of retaining walls, telephone risers, large trees, and include monuments of record and physical survey of monuments and property pins that are found. Provide locations (X & Y coordinates) and elevation of local temporary benchmarks to be used on Project. Property lines will be shown based on Ada County G.I.S. mapping. Contours at one-half foot (1/2’) intervals will be generated. Roadway will be cross-sectioned at 50’ intervals on centerline, edge of pavement, gutter, top of curb and natural ground near ROW. Deliverables • Base mapping pdf with 0.5-foot contours intervals of the project site, including the drain line outfall to the existing sanitary sewer.

Examples of Base Mapping in a sentence

  • Submittals and Base Mapping Submittals will be made at the concept layout, 50-, 75-, and 99-percent design levels.

  • The “SERVICE PROVIDER” agrees to provide services for ▇▇▇▇▇ County Base Mapping as addressed in the specifications for OSIP Aerial Lidar Acquisition, Countywide Hydrography & Contours and incorporated herein as Exhibit A.

  • Reduction in fees: $1,576.00 • Traffic Operation Center (TOC) Evaluation: Reduction in fees: $840.00 • Infrastructure Design / Plans Package Preparation: Staff will perform some of the tasks listed under this item, e.g. Compiling GIS Base Mapping, Coordinating with Utility companies etc.

  • These guidelines will be used for new and updates of Base Mapping Layers.

  • Right of Way Base Mapping (including utility mapping) • Topographic Survey • Typical channel cross-sections (up to 20) • Hydrology and Hydraulic Analysis • All files to be delivered in .pdf format unless specified otherwise Task 5.

  • Caltrans photogrammetry surveys A, B & C submittals · Digital Aerial Base Mapping at a 1”=50’ scale in AutoCAD Civil 3D format · Digital Terrain Model (DTM) · Preliminary Existing R/W for the Project Study Area · Base Mapping with existing utilities ▇▇▇▇ & Peers will lead the preparation of the Traffic Operations Analysis Report (TOAR) for the proposed project with support from ▇▇▇▇▇▇-▇▇▇▇.

  • Task 2.2 Project Base Mapping ▪ The Kittelson team will request existing mapping information from the City, MMPO, MDT, and utilities along the corridor, including: o Existing survey information o Aerial photograph o Right-of-way (GIS) o Utility locations (GIS) ▪ Wet utilities (sanitary and storm mains, water mains, and hydrants) will be obtained from the City).

  • In order to maintain consistency in the production and delivery of GIS Base Mapping Layers between respective Counties, the ADOR has set forth Reference A, Section 4: PLANIMETRIC MAPPING GUIDELINES.

  • Legal Base Mapping Fee $0.00 $0.00 $0.00 .4 Electric, Light, and Power Costs $0.00 $0.00 $0.00 .5 Work by City on behalf of the Developer a.

  • The President shall cause written notification of the names of the Hearing Committee members to be mailed to the Respond ent at least ten (10) days before the date of the hearing.

Related to Base Mapping

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • Database Management System (“DBMS”) is a computer process used to store, sort, manipulate and update the data required to provide Selective Routing and ALI.

  • Prescription monitoring program or "PMP" means the Wash- ington state prescription monitoring program authorized under chapter

  • Soil texture means proportion by weight of sand, silt, and clay in a soil.

  • Listings means information identifying the listed names of subscribers of carriers and subscribers’ telephone numbers, addresses or primary advertising classification or any combination, and that carrier or affiliate has published, caused to be published or accepted for publication in any directory format.