CONSTRUCTION AGREEMENTEngineering Procurement And • June 28th, 2018
Contract Type FiledJune 28th, 2018A Site of the Project 133 1. The Site 133 Annex-I:Site 133 Annex-II: Dates for providing Right of Way 133 Annex-III: Alignment Plans 133 Annex-IV : Environmental Clearances 133
CONSTRUCTION AGREEMENT BY AND BETWEENEngineering, Procurement And • October 1st, 2019
Contract Type FiledOctober 1st, 2019WHEREAS, Owner wishes to engage Contractor to design, engineer, procure, assemble, construct, long-haul transport, interconnect, commission, start up, and test (the foregoing, together with all of Contractor’s other obligations set forth in this Agreement, collectively, the “Work”) a project which will be comprised of three (3) 500kW independently functioning Mobile Battery Storage on Demand Units (each a “Unit”), a docking station (the “Docking Station”), and any ancillary equipment related to the Units and Docking Station that is required pursuant to the Design Documents and Specifications, at the Astoria Generation Station owned by one or more Affiliates of the Contractor (the “Astoria Generation Station”) which will enable the Units to be interconnected to the Owner’s distribution system and will enable Owner to mobilize the Units, individually or in the aggregate, to support its electric distribution system at times when Owner deems such mobilization necessary or advisable, and wh