WSCO Program Process Requirements Sample Clauses

WSCO Program Process Requirements. 1. Participating Vendors shall: a. Complete initial home visit. This visit includes confirming that Applicant has an eligible woodstove to be replaced that is installed and operable. Eligible devices include: i. All uncertified woodstoves that lack an EPA certification label ii. Older EPA certified woodstoves bearing an EPA certification label with a clear manufacturing date. b. Certify in the Program Tracking Form that the old appliance being replaced meets the eligibility criteria in 3.1a and if applicable, provide the manufacturing year for EPA-certified woodstoves. c. If the Participating Vendor determines that an inspection/cleaning is required prior to developing an estimate, submit cost estimate and justification for the inspection/cleaning to DEQ for approval prior to conducting inspection. The cost estimate and justification may be submitted by phone to the WSCO Program Coordinator. The Coordinator has the authority to approve these requests. The cost of this inspection/cleaning, if conducted, will be included in the overall cost of the change-out and will apply toward the capped cost. d. Submit installation estimate to DEQ to the attention of West Silver Valley Targeted Air Shed Analyst, ▇▇▇ ▇▇▇▇▇. Estimates may be submitted via e-mail to ▇▇▇.▇▇▇▇▇@▇▇▇.▇▇▇▇▇.▇▇▇ or by mail to DEQ Kellogg Office, ▇▇▇▇ ▇. ▇▇▇▇▇▇▇▇ Ave., ▇▇▇▇▇▇▇, ID 83837. The estimate must be itemized and must include the following items, at a minimum: i. The Applicant’s name and address. ii. The Participating Vendor’s and any subcontracted installers’ HVAC certificate of competency certificate number (per Idaho Code §54-5011). If the named subcontracted installer has an HVAC apprentice certificate of competency, the estimate must include proof of an HVAC licensed individual/entity that is supervising the install. iii. Cost of new appliance: Clearly itemize the cost of the base model and any DEQ-approved options listed in Section 2 and a description and cost of any extra options requested by the Applicant. iv. Cost of labor: Clearly describe and itemize the cost of basic installation, costs for cleaning chimney/venting, any repair work required to meet all municipal and fire codes, and a description of costs associated with any extra options requested by the Applicant. v. Cost of parts: Clearly describe and itemize the cost of all parts required as part of the basic installation, parts required for any repair work to meet all municipal and fire codes, and parts required for extra o...

Related to WSCO Program Process Requirements

  • Program Requirements The parties shall comply with the Disadvantaged Business Enterprise Program requirements established in 49 CFR Part 26.

  • Access Requirements You will be responsible for providing the System to enable you to use an Electronic Service.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will ▇▇▇▇ ▇▇▇▇▇▇▇ Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Subcontract Requirements As required by Section 6.22(e)(5) of the Administrative Code, Contractor shall insert in every subcontract or other arrangement, which it may make for the performance of Covered Services under this Agreement, a provision that said subcontractor shall pay to all persons performing labor in connection with Covered Services under said subcontract or other arrangement not less than the highest general prevailing rate of wages as fixed and determined by the Board of Supervisors for such labor or services.

  • Match Requirements There is no match required on the part of the Grantee under this Agreement.