Waterproofing Sample Clauses

Waterproofing. All Household Effects and Unaccompanied Air Baggage shall be protected from water damage resulting from rain, humidity or dampness, with the following constituting minimum acceptable protective efforts:
AutoNDA by SimpleDocs
Waterproofing. NOTE: Unless otherwise stated herein, all items in this xxxx shall be deemed to fall into Work Group No. 120 for CPAP formula purposes.
Waterproofing. XXXXXX shall have absolutely no liability or responsibility as to any waterproofing, leaks, water damage or drainage issues. Any damage due by water proofers, roofers, green wall manufacturer or any other reason other than XXXXXX’x direct fault will be billable to CLIENT.
Waterproofing. All waterproofing shall be provided by Tenant. All tenants must install a waterproof membrane within the kitchen areas, toilet rooms, and mop sink areas within any office, retail or restaurant space. The membrane must extend up the wall and all plumbing, piping or electrical conduit, and any other floor penetration a minimum of six inches (6”). Landlord reserves the right to perform a waterproof membrane inspection at Tenant’s expense. Tenant is to provide an accurate installation schedule and coordinate the inspection with Landlord’s Tenant Coordinator prior to installing the final flooring finishes. Waterproof membranes may be required in areas other than stated above, if determined by Landlord that those areas require such protection. Acceptable waterproofing products are manufactured by: Siplast -- xxxx://xxx.xxxxxxx-xxxxxxxxxxxxx.xxx Local Representative -- Xxxx Xxxxx (000) 000-0000 Xxxxxx -- xxxx://xxx.xxxxxxxxxxxx.xx.xx/p_fasttrack.html Local Representative -- Xxxxxx Xxxxx (000) 000-0000 Installation shall comply with all written installation guidelines and published details. Installing contractors shall be approved by the manufacturer. Xxxxxxxxxx and Associates shall be retained by Tenant to provide: • Pre-installation meeting of all parties associated with waterproofing. • Periodic part time inspection with a minimum of three site visits a week. • Review the start and end of all required water tests. Contact Xxxxxx Xxxxxxx, Xxxxxxxxxx & Associates Inc. (000) 000-0000 Plumbing All plumbing work, including but not limited to, the provision of plumbing fixtures, electric water heaters, etc., shall be designed and provided by Tenant. Domestic water piping should be Type K or Type L copper, depending on specifications and insulated per the City of Bellevue Energy Code. All scope must be reviewed and approved by Landlord. Tenant shall provide shut-off valves in the supply piping to every fixture. Toilet rooms with flush valves shall have a dedicated shut off valve to isolate the toilet room from the larger system. All heating of domestic water shall be accomplished using electric water heaters. Tenant shall contract with Landlord’s contractor at Tenant’s expense for all work outside of the Leased Premises. The water heater temperature and pressure relief drain shall be piped to a floor drain or other approved receptacle provided by Tenant. Trap primers are required for all floor drains per City of Bellevue requirements. If a drain is existing, it is the...
Waterproofing. No leaks of water into a basement of any residence are acceptable. However, leaks caused by improper landscaping installed by Purchaser, or failure of Purchaser to maintain proper grades are not covered by the Warranty. Dampness of the walls is often common to new construction and is not considered a deficiency. The Builder will take such action as necessary to correct basement leaks except where the cause is determined to result from Purchaser’s negligence.
Waterproofing. 7.1. SABS approved 350 micron DPC to be installed under all external walls. All waterproofing to be installed in accordance with SABS standards.
Waterproofing. Provide fluid applied two-part urethane rubber waterproofing (Gates) with protection board as specified by the manufacturer.
AutoNDA by SimpleDocs
Waterproofing. Provide written 5-year water-tightness warranty issued by the membrane manufacturer upon completion of the Work.
Waterproofing. The product and its methodology for application must be approved by Principal Agent before it is used. It is a mandatory requirement for the Contractor to attend training to be provided by Supplier. Proof of attendance will be required prior to application of the approved waterproofing product. Carried to Collection R Section 3
Waterproofing. Amount Contractor must prepare a 1m x 1m sample in the presence of the Principal Agent or Engineer. In this case, the Contractor must give at least 48 hours notice prior to the date when the application of the waterproofing product is intended to be done. Contractor to provide a Letter of Compliance confirming that waterproofing has been applied as per Manufacturer's instructions and data sheet. Carried to Collection R Section 3 Bill No. 4 Waterproofing
Time is Money Join Law Insider Premium to draft better contracts faster.