Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.
Development Milestones In addition to its obligations under Paragraph 7.1, LICENSEE specifically commits to achieving (either itself or through the acts of a SUBLICENSEE) the following development milestones in its diligence activities under this AGREEMENT: (a) (b).
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Development Milestone Payments TriSalus shall pay (or cause to be paid) to Dynavax, in accordance with and subject to the terms of this Section 2.3, Section 2.4 and Section 6.4 (each such milestone, a “Development Milestone”, and each payment in respect thereof, a “Development Milestone Payment”): (i) Upon the successful completion by a Milestone Obligor after the Closing of a [**] study with respect to a Product using PEDD, a payment of [**] US Dollars ($[**]), with such Development Milestone Payment being payable only once (for purposes of the foregoing, successful completion means completion of such study in accordance with the plan for such study); (ii) For the first patient Dosed by a Milestone Obligor in each Phase 1 Clinical Trial for a Product for each Indication, a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments, regardless of how many Indications are pursued for a Product or how many Products are in development by Milestone Obligor; (iii) For the first patient Dosed by a Milestone Obligor in each Phase 2 Clinical Trial for a Product for each Indication, a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments regardless of how many Indications are pursued for a Product or how many Products are in development by Milestone Obligor; (iv) For each Phase 2 Clinical Trial for a Product for each Indication conducted by or on behalf of a Milestone Obligor meeting the primary endpoint for such Phase 2 Clinical Trial based on full tables, figures and listings or continued development of such Product for the same Indication as such Phase 2 Clinical Trial, a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments, regardless of how many Indications are pursued for a Product or how many Products are in development by Milestone Obligor; (v) For each Phase 3 Clinical Trial for a Product for each Indication conducted by or on behalf of a Milestone Obligor meeting the primary endpoint for such Phase 3 Clinical Trial based on full tables, figures and listings or continued development of such Product for the same Indication as such Phase 3 Clinical Trial, a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments, regardless of how many Indications are pursued for a Product or how many Products are in development by Milestone Obligor; (vi) Upon receipt by a Milestone Obligor of each Regulatory Approval for any Product for any Indication in the U.S., a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments, regardless of how many Indications are pursued for a Product or how many Products achieve Regulatory Approval; (vii) Upon receipt by a Milestone Obligor for each Regulatory Approval of any Product for any Indication in any country or region outside the U.S., a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments, regardless of how many Indications are pursued for a Product or how many Products achieve Regulatory Approval; (viii) Upon receipt by a Milestone Obligor for each Regulatory Approval for a Product with Orphan Drug Exclusivity for each Indication of a Product in the U.S., a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments (which, for clarity, shall be payable in addition to the Development Milestone payable under Section 2.3(a)(vi) for receipt of such Regulatory Approval), regardless of how many Indications are pursued for a Product or how many Products achieve Regulatory Approval; and (ix) Upon receipt by a Milestone Obligor for each Regulatory Approval for a Product with Orphan Drug Exclusivity for each Indication of a Product in any country or region outside the U.S., a payment of [**] US Dollars ($[**]), up to a maximum of [**] such payments (which, for clarity, shall be payable in addition to the Development Milestone payable under Section 2.3(a)(vii) for receipt of such Regulatory Approval), regardless of how many Indications are pursued for a Product or how many Products achieve Regulatory Approval.
Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.