Ventilation system Sample Clauses

Ventilation system. 3.1. The interface between the trolley and the ventilation system should be solid, rigid and flat. The ventilation device is part of the trolley and not of the impactor as supplied by the manufacturer. Geometrical characteristics of the ventilation device shall be according to Figure 9.
AutoNDA by SimpleDocs
Ventilation system. (a) For sufficient and proper air ventilation in the form of 24V DC, 200 mm cabin fan (12 Nos. Min) shall be provided on each side pillar on both sides of the bus. Further the drivers cab shall be fitted with a 24V DC, 200 mm diameter fan mounted at proper height on side structure. The colour of fan shall match the interior decor of the bus.
Ventilation system. The Company agrees to improve the ventilation system by, first, insuring that the ventilation fan is turned on whenever the Argon gas is turned on and, second, equipping the portable fan with wheels, a canopy, etc. to insure its convenient use.
Ventilation system. 5 Control System. .6 Electrical System. END OF SECTION Bid Opportunity No. 1008-2015 GENERAL COMMISSIONING REQUIREMENTS Transcona Centennial Pool, Phase 1B Page 1 of 16
Ventilation system. General The planning and execution of the below ventilation systems will follow the valid DIN norms, guidelines and regulations. Mechanical ventilation of the office areas is not planned. Basement rooms The inner basement and storage rooms will get air exhaust systems for simple, hourly air renewal in the rooms. Sanitary facilities and pantries as well as interior-lying rooms Sanitary facilities and pantries as well as interior-lying rooms (IT distributor room, etc.) will be given an air exhaust system. The individual ventilators will be located on the roof of the respective building units or in the rooms and will be controlled by means of switch timers. The air supply will come through a door undercut (1.5 cm - 2.0 cm) or front wall-fire protection elements, as per building code requirements. Telephony sound absorbers will be installed if necessary. Construction project: Office and Administrative Building Zeppelinstrasse/Xxxxxx-Xxxxxxx-Strasse, Bad Homburg BUILDING AND EQUIPMENT SPECIFICATION FOR LEASE AREA WING A Version of 10/25/2007
Ventilation system. The cooling and ventilation system will be upgraded to meet present-day standards for indoor climate.

Related to Ventilation system

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • HEATING The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

  • HEATING, VENTILATING AND AIR CONDITIONING General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

  • Sprinkler System If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • HVAC A. Heating, ventilating and air conditioning equipment will be provided with sufficient capacity to accommodate a maximum population density of one (1) person per one hundred fifty (150) square feet of useable floor area served, and a combined lighting and standard electrical load of 3.0 xxxxx per square foot of useable floor area. In the event Tenant introduces into the Premises personnel or equipment which overloads the system’s ability to adequately perform its proper functions, Landlord shall so notify Tenant in writing and supplementary system(s) may be required and installed by Landlord at Tenant’s expense, if within fifteen (15) days Tenant has not modified its use so as not to cause such overload. Operating criteria of the basic system shall not be less than the following:

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Electrical Provide drawings for the following systems:

  • Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.

  • Heating and Air Conditioning Tenant shall not use any method of heating or air-conditioning, other than that supplied by Landlord, without Landlord’s prior written consent.

  • Plumbing fixtures and appliances shall be used only for the purposes for which designed, and no sweepings, rubbish, rags or other unsuitable material shall be thrown or deposited therein. Damage resulting to any such fixtures or appliances from misuse by a tenant or its agents, employees or invitees, shall be paid by such tenant.