TREE PROTECTION PLANS. All detailed architectural, building, engineering (structural, stormwater and drainage services) and landscape documentation submitted for the Construction Certificate shall clearly show on all drawings the retention of trees as required by these conditions of consent, the position of their trunks, full diameter of their canopies, Structural Root Zones (SRZs) and Tree Protection Zones (TPZs).
Appears in 3 contracts
Samples: meetings.cityofsydney.nsw.gov.au, meetings.cityofsydney.nsw.gov.au, meetings.cityofsydney.nsw.gov.au
TREE PROTECTION PLANS. (a) All detailed architectural, building, engineering (structural, stormwater and drainage services) and landscape documentation submitted for the Construction Certificate shall clearly show on all drawings the retention of trees the street tree as required by these conditions of consent, the position of their trunksits trunk, full diameter of their canopiesits canopy, Structural Root Zones (SRZs) and Tree Protection Zones (TPZs).
Appears in 1 contract
Samples: meetings.cityofsydney.nsw.gov.au