Transformers Sample Clauses

Transformers. All transformers connecting PTF transmission lines shall be included in the analysis.
AutoNDA by SimpleDocs
Transformers a. Transformers shall be UL listed and suitable for the application- NEMA 1 or 3 R.
Transformers. Seller has never installed or used any transformer on the Premises that contained polychlorinated biphenyls’ compounds, and to Seller’s knowledge, there are no and never have been any polychlorinated biphenyls’ compounds stored or used on the Premises.
Transformers a. Each transformer in a double ended sub-station shall be sized to serve 75% of the maximum demand on the sub-station. In critical loads such as hospitals and research facilities or where determined to be necessary by the University and design team, this may be increased to 100%.
Transformers. Dry-type K20 rated transformers will be provided for 120/208 volt panels. 16A-00 XXXXXXXXXXX Xxxxxxxxxxx xxxl be 480/277 volt, 3-phase, 4-wire and 120/208 volt, 3-phase, 4-wire with 200% neutrals with provisions for bolt in circuit breakers. Panelboards will be sized for the HVAC 6 wattx xxx square foot and 2 wattx xxx square foot for the 277 volt light fixtures and 6 wattx xxx square foot at for 120/208 volt power. Panelboards will be located in electrical closets on each floor. 16A-08 WIRING DEVICES, OUTLETS AND SWITCHES
Transformers. A 750 Kva three-phase transformer shall be used to the warehouse, and 1 150 kVA transformer to the management, frequency 60Hz, NB1 95kV, In order to protect transformers against overvoltage surges, three 12 kV (10ka) grounded polymeric lightning arresters shall be used, duly interconnected and grounded. There will be a meter of the Concessionary for the warehouse with provision of One QGBT with 6 circuit breakers for distribution of the main loads, in addition to the lighting circuit breakers and service outlets and to the common area of the Condominium.
Transformers. To the extent of Landlord's rights therein, any electric transformer in or on the Land, on the Property, or used by or connected to the Land (collectively the "Transformer") for Tenant to connect thereto to transmit electricity generated by the System to the Grid. (The Equipment and Transformer are more particularly described on Exhibit B attached hereto and incorporated herein by reference.)
AutoNDA by SimpleDocs
Transformers. The Contractor shall test all transformers (Battery step-up, solar step-up and station service transformers) and document tests per applicable standards.
Transformers. In general they must be in good preservation condition, without oxidations or corrosions in the oil drum and tank, deformations in cooling blades. • It will be checked that during its normal operation there is no abnormal vibrations or noises, excess temperatures, relevant leaks of coolant and oil level under the minimum at 20ºC, or very higher. • If the transformer has wheels, it will be checked that they are blocked in order to avoid its movement. The anchor must be fixed to the support or rail by threaded or welded parts, or wheels must be turned. • Preservation status of main and secondary insulators, without having cracks, breakages or excess dirt. The correct fixation to the flap will be checked. • The plate will be properly fixed to the transformer drum and, if possible, visible from the cell outside since all its technical data must be readable. • The external insulation of power cables, control and signalization must not show aging, relevant tears, damages or provoke mechanic strains in insulators and other elements. • Oil analysis will be carried out by authorized laboratories and its cleaning and replacement will be performed as necessary.
Transformers. Electrical transformers located on the barge unloader Facility will be removed and disposed of by NSP, approximately 3 months prior to the use of the Barge Unloader Facility as a staging area
Time is Money Join Law Insider Premium to draft better contracts faster.