Traffic Control Plans. CivilCorp will provide Construction traffic control plans (TCP) for each phase of construction, including lead-in and construction signage, temporary traffic control devices, temporary striping, temporary pavements and drainage facilities, and typical sections at 70%, 95% and 100% submittals illustrating the phases and sub-phases necessary to construct the planned improvements. The design will be developed with as little interruption to the traveling public as possible. It is assumed there will be two (2) traffic control phases for this project. TCP layouts will be prepared on double- banked 11”x17” plan sheets at 1” = 100’ scale All plans will conform to the latest Texas Manual on Uniform Traffic Control Devices (TMUTCD) and Fort Bend County Engineering Design Manual.
Appears in 2 contracts
Sources: Agreement for Professional Engineering Services, Professional Services