Traffic Control Plans. GCE shall evaluate the requirements for traffic control and develop Traffic Control Plans (TCP) for the project in general accordance with the latest edition of the TMUTCD. GCE shall interface and coordinate phases of work, including the TCP, with the Client and adjacent section engineers, as required. 1) GCE shall provide a written narrative of the construction sequencing and work activities per phase and determine the existing and proposed traffic control devices (regulatory signs, warning signs, guide signs, route markers, construction pavement markings, barricades, flag personnel, etc.) to be used to handle traffic during each construction sequence. 2) GCE shall provide traffic control plans showing proposed traffic control devices during each construction phase (stop signs, flag person, etc.). GCE shall also show temporary roadways, structures and detours required to maintain two-way traffic at all times during construction. 3) GCE shall provide typical sections, Construction Notes and Standard Details for TCP design. It is anticipated that temporary traffic signals will not be required for the project. It is also anticipated that the project will be constructed within two phases.
Appears in 2 contracts
Sources: Professional Services, Professional Services