Top Coat Clause Samples
POPULAR SAMPLE Copied 3 times
Top Coat. Top coats of synthetic enamel Paint of desired shade shall be applied after the undercoat is thoroughly dry. Additional finishing coats shall be applied if found necessary to ensure properly uniform glossy surface. Other details shall be as specified above for exterior painting, as far as they are applicable.
Top Coat. The topcoat shall be applied, after the under coat has sufficiently set but not dried at any time, within 48 hours. The proportion of mortar for finishing coat shall be one part of cement and two parts of selected, well graded and washed sand; it shall be applied in a uniform thickness of 5 mm. the surface shall be tapped to uniform grained texture by using sponge/cork sheet/wooden float as directed. Curing shall start after 24 hours and the surface kept wet for seven days.
Top Coat. The materials to be used are: - Wörwag Woeropur – hardener, product no. 108786 - Wörwag Woeropur – top coat W-755 - Wörwag Woeropur – thinner long, product no. 63222 The volumetric 4.5:1 mixing ratio of the final coat (Wörwag) must be followed in accordance with manufacturer's specifications. The ratio must be set with a measuring scale. After you add the hardener, the material is ready to be processed. In the event of extremely warm temperatures (>25°C), up to 2% thinner can be used for adjusting the top coat. The layer thickness of the top coat must be between 40 µm and 60 µm when dry. The surface must be free of paint defects Any runs, drips or flaws in the top coat must be reworked.
