Telemetered Quantities. Alabama Power shall provide the data protocol, and Generator shall install as part of the Interconnection Facilities any equipment necessary to deliver telemetered signals to Alabama Power specifying the voltage and watts, vars, and watthours delivered to the Alabama Power Electric System at the Interconnection Point. VOLTAGE SCHEDULES AT THE INTERCONNECTION POINT FOR SOUTHERN POWER AUTAUGAVILLE COMBINED CYCLE UNIT 2 Commencing with the effective date of the Interconnection Agreement, Generator shall maintain the following voltage schedules as communicated by Alabama Power from time to time: ----------------------------------------------------------------------------- Voltage scheduling Evaluation for Autaugaville CC2 (500 kV) ----------------------------------------------------------------------------- Schedule #1 - Southern Control Area Maximum Load for the day Greater Than 33,000MW ----------------------------------------------------------------------------- Operating Time Autaugaville CC2 500 kV ----------------------------------------------------------------------------- 0000 - 0700 520 0700 - 2100 524 2100 - 2400 520 Schedule #2 - Southern Control Area Maximum Load for the day Between 28,000 and 33,000MW Operating Time Autaugaville CC2 500 kV 0000 - 0700 517 0700 - 2100 524 2100 - 2400 520 Schedule #3 - Southern Control Area Maximum Load for the day Between 23,000 and 28,000MW Operating Time Autaugaville CC2 500 kV 0000 - 0800 517 0800 - 2100 522 2100 - 2400 520 Schedule #4 - Southern Control Area Maximum Load for the day Below 23,000MW Operating Time Autaugaville CC2 500 kV 0000 - 0600 515 0600 - 2100 520 2100 - 2400 515 Alabama Power's determination of whether Schedule 1, 2, 3, or 4 should be used for a given period shall be based on expectations of system requirements and conditions. The voltage schedule to be used, for the upcoming week, shall be communicated to Generator each Friday and at such other times as changing system requirements and conditions may require. SPECIFICATIONS TO INTERCONNECTION AGREEMENT BETWEEN SOUTHERN POWER (AUTAUGAVILLE CC UNIT 2) AND ALABAMA POWER COMPANY
Appears in 1 contract
Telemetered Quantities. Alabama Power shall provide the data protocol, and Generator shall install as part of the Interconnection Facilities any equipment necessary to deliver telemetered signals to Alabama Power specifying the voltage and watts, vars, and watthours delivered to the Alabama Power Electric System at the Interconnection Point. VOLTAGE SCHEDULES AT THE INTERCONNECTION POINT FOR SOUTHERN POWER AUTAUGAVILLE COMBINED CYCLE UNIT 2 1 Commencing with the effective date of the Interconnection Agreement, Generator shall maintain the following voltage schedules as communicated by Alabama Power from time to time: ----------------------------------------------------------------------------- Voltage scheduling Evaluation for Autaugaville CC2 CC1 generation (500 230 kV) ----------------------------------------------------------------------------- Schedule #1 - Southern Control Area Maximum Load for the day Greater Than 33,000MW ----------------------------------------------------------------------------- Operating Time Autaugaville CC2 500 CC1 230 kV ----------------------------------------------------------------------------- 0000 - 0700 520 0700 0500 237 0500 - 2100 524 2100 2200 238 2200 - 2400 520 237 Schedule #2 - Southern Control Area Maximum Load for the day Between 28,000 and 33,000MW Operating Time Autaugaville CC2 500 CC1 230 kV 0000 - 0700 517 0700 0600 237 0600 - 2100 524 238 2100 - 2400 520 237 Schedule #3 - Southern Control Area Maximum Load for the day Between 23,000 and 28,000MW Operating Time Autaugaville CC2 500 CC1 230 kV 0000 - 0800 517 0800 0600 236 0600 - 2100 522 237 2100 - 2400 520 236 Schedule #4 - Southern Control Area Maximum Load for the day Below 23,000MW Operating Time Autaugaville CC2 500 CC1 230 kV 0000 - 0600 515 236 0600 - 2100 520 237 2100 - 2400 515 236 Alabama Power's determination of whether Schedule 1, 2, 3, or 4 should be used for a given period shall be based on expectations of system requirements and conditions. The voltage schedule to be used, for the upcoming week, shall be communicated to Generator each Friday and at such other times as changing system requirements and conditions may require. SPECIFICATIONS TO INTERCONNECTION AGREEMENT BETWEEN SOUTHERN POWER (AUTAUGAVILLE CC UNIT 21) AND ALABAMA POWER COMPANYAND
Appears in 1 contract