The "Telemetered Quantities" clause defines how certain quantities, such as energy or resources, are measured and reported using remote monitoring systems. In practice, this clause specifies that data collected via telemetry—such as real-time meter readings or automated data transmissions—will be used to determine the amounts delivered, consumed, or otherwise relevant to the agreement. By establishing telemetered data as the authoritative source, the clause ensures accuracy, timeliness, and transparency in quantity measurement, reducing disputes and manual errors.
Telemetered Quantities. Georgia Power shall provide the data protocol, and Generator shall install as part of the Interconnection Facilities any equipment necessary to deliver telemetered signals to Georgia Power specifying the voltage and watts, vars, and watthours delivered to the Georgia Power Electric System at the Interconnection Point. VOLTAGE SCHEDULES AT THE INTERCONNECTION POINT SOUTHERN POWER COMPANY Commencing with the Effective Date of the Interconnection Agreement, Generator shall maintain the following voltage schedules as communicated by Georgia Power from time to time: Schedule #1 - Southern Company Control Area Maximum Load for the Day greater than 33,000 MW Operating Time Voltage 0000-0700 237 kV 0700-2100 237 kV 2100-2400 237 kV Schedule #2 - Southern Company Control Area Maximum Load for the Day between 28,000 and 33,000 MW Operating Time Voltage 0000-0700 236 kV 0700-2100 237 kV 2100-2400 236 kV Schedule #3 - Southern Company Control Area Maximum Load for the Day between 23,000 and 28,000MW Operating Time Voltage 0000-0800 236 kV 0800-2100 236 kV 2100-2400 236 kV Schedule #4 - Southern Company Control Area Maximum load for the Day below 23,000 MW Operating Time Voltage 0000-0600 235 kV 0600-2100 236 kV 2100-2400 235 kV The Georgia ITS system operator's determination of whether Schedule 1, 2, 3, or 4 should be used for a given period shall be based on expectations of system requirements and conditions. The voltage schedule to be used, for the upcoming week, shall be communicated to Generator each Friday and at such other times as changing system requirements and conditions may require. APPENDIX B SPECIFICATIONS TO INTERCONNECTION AGREEMENT BETWEEN SOUTHERN POWER COMPANY AND GEORGIA POWER COMPANY 1. Location of Interconnection Point: The Interconnection Point will be at the Georgia Power's Goat Rock 230/115 kV Substation located in Lee County Alabama. 2. Projected Dates Generator's Fac▇▇▇ties will connect to Georgia Power: Station Service Date: July 1, 2001 Initial Synchronization of Generator for Testing Date: September 1, 2001 Commercial Operation Date: April 1, 2002 3. Description of Interconnection Point: The point, as shown on the attached one line diagram, at which the Generator's 230 kV conductors connect to the new ring bus element at Georgia Power's Goat Rock 230/115 kV Substation. 4. Description of Station Service Connections: Should Generator require station service in addition to that which Generator can self-provide, separate arrangements will be m...
Telemetered Quantities. Alabama Power shall provide the data protocol, and Generator shall install as part of the Interconnection Facilities any equipment necessary to deliver telemetered signals to Alabama Power specifying the voltage and watts, vars, and watthours delivered to the Alabama Power Electric System at the Interconnection Point. VOLTAGE SCHEDULES AT THE INTERCONNECTION POINT FOR SOUTHERN POWER AUTAUGAVILLE COMBINED CYCLE UNIT 2 Commencing with the effective date of the Interconnection Agreement, Generator shall maintain the following voltage schedules as communicated by Alabama Power from time to time: ----------------------------------------------------------------------------- Voltage scheduling Evaluation for Autaugaville CC2 (500 kV) ----------------------------------------------------------------------------- Schedule #1 - Southern Control Area Maximum Load for the day Greater Than 33,000MW ----------------------------------------------------------------------------- Operating Time Autaugaville CC2 500 kV ----------------------------------------------------------------------------- 0000 - 0700 520 0700 - 2100 524 2100 - 2400 520 Schedule #2 - Southern Control Area Maximum Load for the day Between 28,000 and 33,000MW Operating Time Autaugaville CC2 500 kV 0000 - 0700 517 0700 - 2100 524 2100 - 2400 520 Schedule #3 - Southern Control Area Maximum Load for the day Between 23,000 and 28,000MW Operating Time Autaugaville CC2 500 kV 0000 - 0800 517 0800 - 2100 522 2100 - 2400 520 Schedule #4 - Southern Control Area Maximum Load for the day Below 23,000MW Operating Time Autaugaville CC2 500 kV 0000 - 0600 515 0600 - 2100 520 2100 - 2400 515 Alabama Power's determination of whether Schedule 1, 2, 3, or 4 should be used for a given period shall be based on expectations of system requirements and conditions. The voltage schedule to be used, for the upcoming week, shall be communicated to Generator each Friday and at such other times as changing system requirements and conditions may require. SPECIFICATIONS TO INTERCONNECTION AGREEMENT BETWEEN SOUTHERN POWER (AUTAUGAVILLE CC UNIT 2) AND ALABAMA POWER COMPANY
Telemetered Quantities. Georgia Power shall provide the data protocol, and Tenaska shall install as part of the Interconnection Facilities any equipment necessary to deliver telemetered signals to Georgia Power specifying the voltage and watts, vars, and watthours delivered to the Georgia Power Electric System at the Interconnection Point. Appendix A APPENDIX B SPECIFICATIONS TO INTERCONNECTION AGREEMENT BETWEEN TENASKA AND GEORGIA POWER COMPANY 1) LOCATION OF INTERCONNECTION POINT: Adjacent to the ▇▇▇▇▇▇▇ - ▇▇▇▇▇▇▇ 500 kV ITS transmission line in Heard County, Georgia near the City of Franklin, Georgia.

Related to Telemetered Quantities

  • ESTIMATED QUANTITIES 1.1 The quantities set forth in the line items and specification document are approximate and represent the estimated requirements for the contract period. 1.2 Items listed may or may not be an inclusive requirements for this category. 1.3 Category items not listed, but distributed by bidder are to be referred to as kindred items. Kindred items shall receive the same percentage of discount or pricing structure as items listed in the specification document. 1.4 The unit prices and the extended total prices shall be used as a basis for the evaluation of bids. The actual quantity of materials necessary may be more or less than the estimates listed in the specification document, but the City/County shall be neither obligated nor limited to any specified amount. If possible, the Owners will restrict increases/decreases to 20% of the estimated quantities listed in the specification document.

  • Contract Quantity The Contract Quantity during each Contract Year is the amount set forth in the applicable Contract Year in Section D of the Cover Sheet (“Delivery Term Contract Quantity Schedule”), which amount is inclusive of outages.

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Quantities The estimated quantities provided by the City are not guaranteed. These quantities are listed for informational purposes only. Quantities vary depending on the demands of the City. Any variations from the estimated quantities shall not entitle the bidder to an adjustment in the unit price or any additional compensation.