Common use of System Documentation Clause in Contracts

System Documentation. The Supplier will provide following documentation: - Base Station Specifications - Vehicle Location Unit Specifications - Personal Location Unit Specifications - Control Center Diagrams - Control Center Infrastructure requirements specifications - Base Station Infrastructure requirements specifications - Control Center Operating Procedures - Fleet Management post Operating Manual - VLU and PAL Registration and Activation Procedure - System Acceptance Test Procedures - Vehicle Location Unit general installation instructions - Monthly progress reports - Design Reviews documentation The above documentation will be in English. TELEMATICS WIRELESS AND ITURAN PROPRIETARY INFORMATION Local contractors, responsible for Control Center and Base Station infrastructure preparation, will maintain documentation for each of the sites to be established. The documentation of the control center will include a detailed description of the electricity system, including all interim boards and the main electricity board, specifying the types of cables and automatic switches. The markings of the switches in the documentation will be identical to their markings on electricity boards. The documentation of the system will include diagrams of the connections of all components of the system, specifying numbers of cables, types of cables, and names of connectors. The markings in the diagrams will be identical to the markings on cables and connectors. For each of the base stations the local contractor will prepare a booklet, indicating the site on a map with a scale of 1:100000. The booklet will also contain a descriptive diagram of the site and the mast, specifying the disposition of the dedicated equipment, and digital photographs of the interior and exterior of the site. The documentation will include a complete address of the site, precise coordinates of the antennas, the name and telephone numbers of the site owner, the name and telephone numbers of the contractor's liaison, details of electricity feeding up to the structure's main board, and the paths of communication and grounding lines. The local contractor will provide a detailed description of the connections between components of the system, including types of cables, their length, and types of connectors. The contractor will specify the manufacturer's number of each of the items of equipment installed at the site, including air-conditioner, electricity board, and components of the locating system. The station's infrastructure acceptance test report will be attached to the booklet. All of the material will be submitted on magnetic media and in a hard copy. TELEMATICS WIRELESS AND ITURAN PROPRIETARY INFORMATION LIST OF APPENDIXES APPENDIX A: Equipment List APPENDIX B: Detailed Project Schedule (to be provided at PDR) APPENDIX C: Price and Terms of Payment APPENDIX D: Infrastructure Acceptance Test - Base Stations APPENDIX E: Infrastructure Acceptance Test - Command Center APPENDIX F: System Acceptance Test Principles APPENDIX G: Operational Control Center general Description APPENDIX H: Requirements from Digital Mapping Content APPENDIX I: Letter Of Credit Principal Terms APPENDIX J: End User Equipment Purchase Agreement (to be further discussed and agreed upon) TELEMATICS WIRELESS AND ITURAN PROPRIETARY INFORMATION APPENDIX D INFRASTRUCTURE ACCEPTANCE TEST: BASE STATIONS Base station's infrastructure acceptance tests will consist of the following: MAST o Testing the existence and integrity of all permits required for the establishment and operation of the base station. o Approval of the mast by a Safety Engineer. o Results of geodesic measurements.

Appears in 2 contracts

Samples: Agreement (Ituran Location & Control Ltd.), Agreement (Ituran Location & Control Ltd.)

AutoNDA by SimpleDocs

System Documentation. The Supplier will provide following documentation: - Base Station Specifications - Vehicle Location Unit Specifications - Personal Location Unit Specifications - Control Center Diagrams - Control Center Infrastructure requirements specifications - Base Station Infrastructure requirements specifications - Control Center Operating Procedures - Fleet Management post Operating Manual - VLU and PAL Registration and Activation Procedure - System Acceptance Test Procedures - Vehicle Location Unit general installation instructions - Monthly progress reports - Design Reviews documentation The above documentation will be in English. TELEMATICS WIRELESS AND ITURAN PROPRIETARY INFORMATION Local contractors, responsible for Control Center and Base Station infrastructure preparation, will maintain documentation for each of the sites to be established. The documentation of the control center will include a detailed description of the electricity system, including all interim boards and the main electricity board, specifying the types of cables and automatic switches. The markings of the switches in the documentation will be identical to their markings on electricity boards. The documentation of the system will include diagrams of the connections of all components of the system, specifying numbers of cables, types of cables, and names of connectors. The markings in the diagrams will be identical to the markings on cables and connectors. For each of the base stations the local contractor will prepare a booklet, indicating the site on a map with a scale of 1:100000. The booklet will also contain a descriptive diagram of the site and the mast, specifying the disposition of the dedicated equipment, and digital photographs of the interior and exterior of the site. The documentation will include a complete address of the site, precise coordinates of the antennas, the name and telephone numbers of the site owner, the name and telephone numbers of the contractor's liaison, details of electricity feeding up to the structure's main board, and the paths of communication and grounding lines. The local contractor will provide a detailed description of the connections between components of the system, including types of cables, their length, and types of connectors. The contractor will specify the manufacturer's number of each of the items of equipment installed at the site, including air-conditioner, electricity board, and components of the locating system. The station's infrastructure acceptance test report will be attached to the booklet. All of the material will be submitted on magnetic media and in a hard copy. In consideration of the mutual obligations assumed under this Annex, Buyer, Agent and Supplier agree to this Annex, which is executed by duly authorized representatives as of the dates below: AGREED BY: GOLDEN NET COMMUNICATION TECHNOLOGY LTD DIGITRACK (CHINA) GROUP CO. LTD By: /s/ [chinese characters] By: /s/ [chinese characters] Title: Chairman Title: [chinese characters] Date: [chinese characters] Date: [chinese characters] TELEMATICS WIRELESS AND ITURAN PROPRIETARY INFORMATION LTD. /s/ Avry Franco /s/ Roman Sternberg By: Xxxx Xxxnco Roxxx Xxxxxxxxx Title: X.X. & X.X.O. VP Xxxxxxxxx Xxxe: 29.08.04 29.08.04 12 LIST OF APPENDIXES APPENDIX A: Equipment List APPENDIX B: Detailed Project Schedule (to be provided at PDR) APPENDIX C: Price and Terms of Payment APPENDIX D: Infrastructure Acceptance Test - Base Stations APPENDIX E: Infrastructure Acceptance Test - Command Center APPENDIX F: System Acceptance Test Principles APPENDIX G: Operational Control Center general Description APPENDIX H: Requirements from Digital Mapping Content APPENDIX II : Letter Of Credit Principal Principle Terms APPENDIX JJ : End User Equipment Purchase Agreement (to be further discussed and agreed upon) TELEMATICS WIRELESS <TABLE> *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- No. part description vendor part number Qty.for installation ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 1 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 2 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 3 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 5 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 6 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 7 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 8 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 9 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 10 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 11 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 37 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 38 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 39 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 40 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 41 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 42 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 43 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 44 *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 45 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 46 *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 47 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 61 *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 62 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- </TABLE> *** Confidential material redacted and filed separately with the Commission. <TABLE> ----------- ------------------------------------------ -------------------------------- -------------------------------------------- No. part description vendor part number Qty. for installation ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** *** *** *** *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 63 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 64 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 65 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 66 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 67 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 68 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 69 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 70 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 71 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 72 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 73 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 74 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 75 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 76 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 77 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 78 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 79 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 80 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 81 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 82 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 83 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 84 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 85 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 86 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 87 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 88 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- 89 *** *** ----------- ------------------------------------------ -------------------------------- -------------------------------------------- </TABLE> *** Confidential material redacted and filed separately with the Commission. Annex I - Appendix B [GRAPHIC OMITTED] ITURAN SYSTEM DEPLOYMENT IN SHANGHAI - PRICES AND ITURAN PROPRIETARY INFORMATION APPENDIX D INFRASTRUCTURE ACCEPTANCE TEST: BASE STATIONS Base station's infrastructure acceptance tests will consist of TERMS OF PAYMENT This document addresses the following: MAST o Testing Deployment cost o End-user equipment cost o Licensing fees All the existence and integrity of all permits required prices presented below are FOB Israel (for the establishment and operation of the base station. o Approval of the mast by a Safety Engineer. o Results of geodesic measurementsrelevant items).

Appears in 2 contracts

Samples: Agreement (Ituran Location & Control Ltd.), Agreement (Ituran Location & Control Ltd.)

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.