Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 2022.
Appears in 13 contracts
Sources: Construction Management Agreement, Guaranteed Maximum Price Agreement, Construction Management Services Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 20222024.
Appears in 7 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 1, 20222025.
Appears in 4 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 20222025.
Appears in 3 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31June 2, 20222023.
Appears in 3 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31August 2, 20222018.
Appears in 3 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31, 20222021.
Appears in 3 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 8, 20222025.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by by: Phase I β July 3129, 20222023 and Phase II β July 29, 2024.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Construction Management Services Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31January 3, 20222023.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31, 20222018.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31April 21, 2022.
Appears in 2 contracts
Sources: Construction Management Services Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 3130, 20222025.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31, 2022.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31April 11, 20222025.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31October 2, 20222023.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31September 30, 20222024.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31January 4, 20222024.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by July 31March 20, 20222023.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 3130, 20222021.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 30, 20222023.
Appears in 2 contracts
Sources: Guaranteed Maximum Price Agreement, Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by July 31January 28, 20222026.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31April 8, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31June 30, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31September 1, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31January 29, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31, 20222017.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July December 31, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31, 20222020.
Appears in 1 contract
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 16, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31August 3, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by July 31, 20222021.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 1, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31September 1, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31October 7, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31November 3, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 8, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31December 1, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 3128, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 319, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 21, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31March 3, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31August 9, 20222019.
Appears in 1 contract
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 3115, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 30, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31May 1, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31April 22, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31April 3, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July December 31, 20222020.
Appears in 1 contract
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by July 31October 23, 20222019.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31May 12, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by July 31, 20222019.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31September 29, 20222017.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31April 15, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31May 14, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31February 19, 20222026.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31June 14, 20222020.
Appears in 1 contract
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July March 31, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July December 31, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31November 24, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31June 5, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31March 30, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31December 8, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31April 9, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31August 22, 20222021.
Appears in 1 contract
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31January 25, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 4, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 29, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31August 3, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31May 11, 20222026.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31November 28, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31March 21, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by July 31January 14, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by July 31August 1, 20222019.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July October 31, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 313, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31April 12, 20222023.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31August 1, 2022.
Appears in 1 contract
Sources: Construction Management Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31November 11, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31January 3, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31June 6, 20222025.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by July December 31, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build shall be achieved by July 31October 13, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31December 14, 2022.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management Design Build Services shall be achieved by July December 31, 20222020.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement
Substantial Completion Date. Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31June 3, 20222024.
Appears in 1 contract
Sources: Guaranteed Maximum Price Agreement