Sprint PCS Technical Program Requirements. Standard/ Definition/ Initial Recurring Minimum Requirement Source Document Certification Verification ------------------------------------------------------------------------------------------------------------------ (Note #1) (Note #1) ------------------------------------------------------------------------------------------------------------------ RF-ENGINEERING: ------------------------------------------------------------------------------------------------------------------ 1. Area Availability - ****% Rev. 8 (Note #2) X X ------------------------------------------------------------------------------------------------------------------ 2. Grade of Service/Sector Rev. 8 X X Blocking rate ****% bh (Using the Grade of Service traffic model, the ratio of blocked call attempts to total call attempts during a typical Busy Hour (BH) on a per sector basis shall be less than 1% (Erlang B or approved alternate model)) Note #4 ------------------------------------------------------------------------------------------------------------------ 3. FER less than ****% (within area of Rev. 8 X X ****% availability) ------------------------------------------------------------------------------------------------------------------ 4. Dropped Call less than ****% Rev. 8 X X (The percentage of Dropped Calls will be ****% or less initially measured through call sampling during Optimization and post-launch as measured through Service Measurement captured statistics. In the initial Drive Test Optimization process, the number of effective calls shall be **** or greater.) Note #4 ------------------------------------------------------------------------------------------------------------------ [****] CERTAIN PORTIONS INDICATED BY "****" HAVE BEEN OMITTED PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT AND FILED SEPARATELY WITH THE COMMISSION. Exhibit 7.2
Appears in 2 contracts
Sources: Management Agreement (Ipcs Equipment Inc), Management Agreement (Ipcs Equipment Inc)