Soils / Geotechnical Program Sample Clauses

Soils / Geotechnical Program. The mission of the Soils/Geotechnical Program is to provide geological and geotechnical engineering recommendations and support for the design, construction and maintenance of CDOT projects involving roadway cut and fill, bridge, retaining wall, and other transportation structure foundations. This Program manages the Western Alliance for Quality Transportation Construction (WAQTC) and CDOT Soils and Embankment Inspector certification for construction soil testers. This Program also manages CDOT’s geotechnical drilling operations, which includes the installation of geotechnical instrumentation for long term monitoring. The Soils/Geotechnical Program works collaboratively with the Geohazards Program and the Regions to evaluate geotechnical and geological hazards such as embankment and slope failures, landslides, sink holes, debris flows and others, as they affect safety and mobility, along with providing emergency services for these features.
AutoNDA by SimpleDocs
Soils / Geotechnical Program. The mission of the Soils/Geotechnical Program is to provide engineering and geotechnical recommendations for the design, construction and maintenance of CDOT projects involving roadway cut and fill, bridge, retaining wall, and other transportation structure foundations. The Soils/Geotechnical Program works collaboratively with the Geohazards Program to evaluate geotechnical and geological hazards such as embankment and slope failures, landslides, sink holes, debris flows and others, as they affect safety and mobility. The Program also manages CDOT’s geotechnical drilling operations and installs geotechnical instrumentation for long term monitoring. The following are also performed: • Provide support, review and project management for the development of design plans and specifications concerning soil and rockfall projects; • Provide geologic hazards expertise by assessing safety, recommending mitigation alternatives and inspecting mitigation construction; • Provide emergency geological service for CDOT projects; and • Update and administer the Rockfall Management Plan.

Related to Soils / Geotechnical Program

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Geotechnical Engineer « »« » « » « » « » « »

  • INTERNET PLANNING, ENGINEERING AND OPERATIONS ‌ Job Title: Internet/Web Engineer Job#: 2620 General Characteristics Integrally involved in the development and support of all Internet/Intranet/Extranet sites and supporting systems. Works closely with other IT groups and customers to define the system design and user interface based on customer needs and objectives. Participates in all phases of the development and implementation process, and may act as a project manager on special projects. Ensures the integration of the Web servers and all other supporting systems. Responsible for system tuning, optimization of information/data processing, maintenance and support of the production environment.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

Time is Money Join Law Insider Premium to draft better contracts faster.