Smoke Control Sample Clauses

Smoke Control. Section 1705.18: Tests shall be in accordance with IBC Sections 1705.18 through 1718.2 18
AutoNDA by SimpleDocs
Smoke Control. The building toilet exhaust vertical shaft shall be utilized as a central office tower smoke exhaust through smoke emergency automatic dampers. Stair pressurization at each above and below grade exit stair as required by code.
Smoke Control. 1 Install stairwell pressurization in the two exit stairwells in Tower A. Ensure they are in compliance with The Life Safety Code, NFPA 101. NFPA requires 15 lbs. to release the door hatch, 30 lbs. to set the door in motion and 15 lbs. to open the door to required EXHIBIT C width. The stair pressurization system must have a pressure difference across the barrier of not less than .05 in. water column.
Smoke Control a. Each stairwell will be pressurized with outside air via pressurization fans and vertical riser distribution ducts. The fans will be activated automatically by the fire alarm and/or smoke detection system.
Smoke Control 

Related to Smoke Control

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer.

  • Job Control Personal Data being processed on commission (i.e., Personal Data processed on a customer’s behalf) is processed solely in accordance with the Agreement and related instructions of the customer. Measures: • SAP uses controls and processes to monitor compliance with contracts between SAP and its customers, subprocessors or other service providers. • As part of the SAP Security Policy, Personal Data requires at least the same protection level as “confidential” information according to the SAP Information Classification standard. • All SAP employees and contractual subprocessors or other service providers are contractually bound to respect the confidentiality of all sensitive information including trade secrets of SAP customers and partners.

  • Climate Control a. The air conditioning/heating units shall be functional at all times.

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

  • Control Notwithstanding any other provision of the Agreement, it is understood and agreed that the Trust shall at all times retain the ultimate responsibility for and control of all functions performed pursuant to this Agreement and has reserved the right to reasonably direct any action hereunder taken on its behalf by the Sub-Adviser.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Weed Control The tenant shall control all noxious weeds on the subject lands and maintain all summerfallow in a reasonably weed-free condition.

  • Fraud Control BellSouth will provide seven days per week, 24-hours per day, fraud monitoring on Calling Cards, xxxx-to-third and collect calls made to numbers in BellSouth’s LIDB, provided that such information is included in the LIDB query. BellSouth will establish fraud alert thresholds and will notify <<customer_name>> of fraud alerts so that <<customer_name>> may take action it deems appropriate.

Time is Money Join Law Insider Premium to draft better contracts faster.