Services During Post Construction Phase Sample Clauses
The 'Services During Post Construction Phase' clause defines the responsibilities and services that a contractor or consultant must provide after the main construction work is completed. Typically, this includes tasks such as addressing defects, conducting final inspections, providing maintenance guidance, or assisting with the handover process to the client. By outlining these obligations, the clause ensures that any issues arising after construction are properly managed and that the transition to occupancy or operation is smooth and well-supported.
Services During Post Construction Phase. The services to be provided by the Engineer during the Post-Construction Phase shall include without limitation the services set forth below. All post construction services set forth below must be completed by the Engineer within ninety (90) days after Substantial Completion of the construction work for the Project, unless otherwise authorized by the Commissioner.
Services During Post Construction Phase. The Construction Manager shall provide construction management services during the Post Construction Phase, as directed by the Director. Such construction management services shall include without limitation the services set forth below.
11.6.1 Manage and supervise the delivery and installation of fixtures, furniture, and equipment for the Project, as specified by CUCF.
11.6.2 Manage and supervise training sessions provided by the construction Subcontractors for all equipment and/or systems installed.
11.6.3 Obtain and deliver to the Director permanent Certificates of Occupancy for the Project.
11.6.4 Submit to the Director originals of all final Project records, including without limitation, (1) all reports for the Project, including inspector’s reports, as well as laboratory and plant testing reports; (2) all certificates, warranties and guarantees from manufacturers; (3) office and/or field diaries or log books; (4) all original records with respect to Subcontractor payments; (5) record “As Built” Drawings; (6) progress photographs of the construction, and
Services During Post Construction Phase. The services to be provided by the CM during the Post Construction Phase shall include without limitation the services set forth below, as directed in writing by the Commissioner.
6.5.1 Manage and supervise the delivery and installation of fixtures, furniture and equipment for the Project, as specified by the Commissioner.
6.5.2 Manage and supervise user acceptance orientation sessions provided by the construction contractors for all equipment and/or systems installed. Such orientation sessions shall provide instructions regarding the use and navigation of project information and records in digital form (i.e., in BIM), including As Built Drawings.
6.5.3 Assist the Commissioner in obtaining permanent Certificates of Occupancy for the Project.
6.5.4 If directed by the Commissioner, conduct a post-occupancy inspection and evaluation of the Project prior to the expiration of one (1) year from Substantial Completion and report to the Commissioner any deficiencies in materials or workmanship or damage caused by such deficiencies that the construction contractor may be required to repair, replace, restore or rebuild pursuant to the Article titled “Maintenance and Guaranty” in the Standard Construction Contract.
6.5.5 Submit to the Commissioner originals of all final Project records, including without limitation, (1) all reports for the Project, including inspector’s reports, as well as laboratory and plant testing reports; (2) all certificates, warranties and guarantees from manufacturers; (3) office and/or field diaries or log books; (4) all original records with respect to contractor payments; (5) all Record Drawings (also known as “As-Built Drawings”), in hard copy, as well as in digital form (i.e., in the form of BIMs);