Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.
Directory Listing and Directory Distribution 41 5. Voice Information Service Traffic 43 6. Intercept and Referral Announcements 44 7. Originating Line Number Screening (OLNS) 44 8. Operations Support Systems (OSS) Services 44 9. Poles, Ducts, Conduits and ▇▇▇▇▇▇-▇▇-▇▇▇ ▇▇ ▇▇. Telephone Numbers 51 11. Routing for Operator Services and Directory Assistance Traffic 51 12. Unauthorized Carrier Change Charges 52 13. Good Faith Performance 52 INTERCONNECTION ATTACHMENT. 53 1. General 53 2. Points of Interconnection and Trunk Types 53 3. Alternative Interconnection Arrangements 57 4. Initiating Interconnection 58 5. Transmission and Routing of Telephone Exchange Service Traffic 59
Single Source Selection Services for tasks in circumstances which meet the requirements of paragraph 3.10 of the Consultant Guidelines for Single Source Selection, may, with the Association's prior agreement, be procured in accordance with the provisions of paragraphs 3.9 through 3.13 of the Consultant Guidelines.