S-BSS Development Clause Samples
S-BSS Development. The Contractor shall perform all tasks necessary to design, prototype, develop, implement, install, test, and operationally deploy a satellite base station subsystem which meets the requirements set forth in this SOW, the TSN_SAT_2_TRD-S-BSS Functional Requirements, and the other documents that comprise the S-BSS contract. To facilitate a progressive development of S-BSS functionality, the S-BSS project shall include a succession of two functionality releases as defined in Exhibit B, TSN_SAT_2_TRD-S-BSS Functional Requirements. The definitions contained in the Exhibit B were determined based on the following TerreStar requirements. (Note: Release 1 is separated into 3 point releases defined below) Release 1.0 shall contain the capacity and functionality that TerreStar requires to perfect the Mobile Satellite Services (MSS) Spectrum no later than the end of the second quarter of 2009. [***]. The following are the major program milestones: [***] Functionality Release 1 shall have a SRR/PDR and Release 1 and 2 shall have a, CTS, Technical Verification Test (TVT) and Operational Verification Test (OVT) in accordance with sections 3.2 and 3.5 with acceptance of the Release occurring after successful completion of Operational Verification. (Release 1.0 shall have an SRR/PDR, CDR, and CTS. Release 1.1 and 1.5 shall have a TVT and OVT) After installation of the Canadian S-BSS, a mutually agreed Release 2 OVT Regression Test that shall consist of a subset of the Release 2 OVT shall be conducted followed by a Canadian gateway ▇▇▇. Functionality Release 1.1, 1.5, and 2 shall include documentation updates for all affected S-BSS documents defined in section 3.10 in accordance with the schedule defined in Figure 3-2 Contract Deliverable Schedule. Final Acceptance shall include all documentation updates for all affected documents defined in section 3.11 in accordance with the schedule defined in Figure 3-2 Contract Deliverable Schedule. The dates for the SRR/PDR and CDR shall be determined by mutual consent. Network capacity for each Operational Verification Test or OVT Regression Test shall be as follows: [***] The network capacity at each gateway shall be capable of being used within any of the 550 nominal satellite beams required to cover the Primary and Secondary coverage areas as defined in the satellite specification, in any amount of bandwidth, as selected by TerreStar.
Release 1 Structure for Point Releases The SBSS will contain 3 point releases for Release 1 in ...
S-BSS Development. The Contractor shall perform all tasks necessary to design, prototype, develop, implement, install, test, and operationally deploy a satellite base station subsystem which meets the requirements set forth in this SOW, the [***], and the other documents that comprise the S-BSS contract. To facilitate a progressive development of S-BSS functionality, the S-BSS project shall be include a succession of [***] functionality releases as defined in Exhibit B, [***]. The definitions contained in the Exhibit B were determined based on the following TerreStar requirements. [***]. The following are the major program milestones: [***] [***] shall have an SRR/PDR, CDR, CTS, Technical Verification Test and Operational Verification Test in accordance with sections 3.2 and 3.5 with acceptance of the Release occurring after successful completion of Operational Verification. As stated above, [***] shall include documentation updates for all affected S-BSS documents defined in section 3.10 in accordance with the schedule defined in Figure 3-2 Contract Deliverable Schedule. The dates for the SRR/PDR and CDR shall be determined by mutual consent. Network capacity for each Operational Verification Test shall be as follows: Exhibit A Use or disclosure of the data contained on this sheet is subject to the restriction on the title page. TerreStar Satellite Base Station Subsystem SOW [***]
S-BSS Development. The Contractor shall perform all tasks necessary to design, prototype, develop, implement, install, test, and operationally deploy a satellite base station subsystem which meets the requirements set forth in this SOW, the [***], and the other documents that comprise the S-BSS contract. To facilitate a progressive development of S-BSS functionality, the S-BSS project shall include a succession of [***] functionality releases as defined in Exhibit B, [***]. The definitions contained in the Exhibit B were determined based on the following TerreStar requirements. [***]. The following are the major program milestones: · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] · [***] [***] shall have an SRR/PDR, CDR, CTS, Technical Verification Test (TVT) and Operational Verification Test (OVT) in accordance with sections 3.2 and 3.5 with acceptance of the Release occurring after successful completion of Operational Verification. [***] shall include documentation updates for all affected S-BSS documents defined in section 3.10 in accordance with the schedule defined in Figure 3-2 Contract Deliverable Schedule. The dates for the SRR/PDR and CDR shall be determined by mutual consent. Use or disclosure of the data contained on this sheet is subject to the restiction on the title page. TerreStar Satellite Base Station Subsystem SOW Network capacity for each Operational Verification Test shall be as follows: · [***] · [***] The network capacity at each gateway shall be capable of being used within any of the [***] satellite beams required to cover the Primary and Secondary coverage areas as defined in the satellite specification, in any amount of bandwidth, as selected by TerreStar.
