ROW Requirements Sample Clauses
The ROW (Right of Way) Requirements clause defines the obligations and conditions related to accessing, using, or crossing another party's property for specific purposes, such as installing utilities or infrastructure. Typically, this clause outlines the process for obtaining necessary permissions, maintaining the area, and restoring it after use, and may specify limitations on the type or timing of activities allowed within the right of way. Its core practical function is to ensure that both parties understand their rights and responsibilities regarding property access, thereby preventing disputes and facilitating smooth project execution.
POPULAR SAMPLE Copied 1 times
ROW Requirements. The Engineer shall determine the ROW requirements based on the proposed alignment, typical sections, design cross sections, access control, terrain, construction requirements, drainage, clear zone, maintenance, Intelligent Transportation System (ITS) and environmental mitigation requirements.
ROW Requirements. No additional right-of-way is anticipated for the project; however additional right-of-way or easements may be needed for stormwater drainage improvements, environmental mitigation, temporary construction easements, or other project elements. The Engineer shall establish the existing ROW and identify the proposed alignments, typical sections, access control, terrain, construction requirements, drainage, clear zone, maintenance, and environmental mitigation requirements.
ROW Requirements. DocuSign Envelope ID: 4154F7E6-47C6-48AD-BA70-902BFE5F00DC The Engineer shall determine the ROW requirements based on the proposed alignment, typical sections, design cross sections, access control, terrain, construction requirements, drainage, clear zone, maintenance, Intelligent Transportation System (ITS) and environmental mitigation requirements.
ROW Requirements. The Engineer shall provide early identification of the ROW and drainage easement requirements and temporary construction easements, based on the proposed alignment, typical sections, access control, terrain, construction requirements, drainage, clear zone, maintenance, and any environmental mitigation requirements.
ROW Requirements. The Engineer, in consultation with TxDOT, shall determine the ROW and drainage easement requirements and temporary construction easements, based on the proposed alignment, typical sections, access control, terrain, construction requirements, drainage, clear zone, maintenance, and environmental mitigation requirements.
ROW Requirements. The Engineer shall consider the right-of-way (ROW) requirements based on the proposed design cross sections, access, terrain, construction requirements, drainage, clear zone, maintenance, and environmental mitigation requirements if applicable.