Rock Source. The crushed road rock for Project Nos. 1 and 3 shall be produced with Project No. 2. Rock for Project No. 2 may be obtained from Hampton Tree Farms, Inc. land at the location shown as Xxxxxx Quarry, located in the NE ¼, Section 34, T7N, R7W. Riprap rock for the fill reconstruction site on Road I1 to I2 may be obtained from the Trailover Quarry located in the NE ¼, Section 14, T6N, R7W on Exhibit A, or from other locations acceptable to STATE. Required pit run and riprap rock must be developed. Development and use of the rock quarries shall be in accordance with Exhibit D. Project No. 1. Sale Access Road Construction, Road Improvement, and Landing Construction. Construct roads, improve roads, and construct landings between and at the following road points according to the specifications in Exhibits B, C, and E: Construct: 1A to 1B, 1C to 1D, 1G to 1H, 1I to 1J, 1K to 1L, 1M to 1N, 2A to 2B, 2C to 2D, 2E to 2F, 2G to 2H, 2I to 2J, 2K to 2L, 2M to 2N, 2O to 2P, 2Q to 2R, 3A to 3B, and 4A to 4B. Improve: I1 to I2. Landings: 1B, 1D, 1H, 1J, 1L, 1N, 1O, 1P, 2B, 2D, 2F, 2H, 2J, 2L, 2N, Stations 9+00 and 13+00 of 2M to 2N, 2P, 2R, 2S, 3B, 3C, 3D, 4B, 4C, and 4D. Grass Seeding. Seed all areas of exposed soils resulting from road and landing construction, and road improvement including cut slopes, fill slopes, and waste areas in accordance with the specifications in Exhibit H. Right-of-Way Hauling. Prior to approval to rock constructed roads, right-of-way logs shall be hauled, unless otherwise approved in writing by STATE. Project No. 2. Xxxxxx Quarry Development and Rock Crushing. Crush/develop the following quantities of rock:

Appears in 1 contract

Samples: apps.odf.oregon.gov

AutoNDA by SimpleDocs

Rock Source. The crushed road rock for Project Nos. 1 and 3 shall be produced with Project No. 2. Rock for Project No. 2 may be obtained from Hampton Tree Farms, Inc. STATE land at the location locations shown as Xxxxxx “Rock Quarry, located in the NE ¼, Section 34, T7N, R7W. Riprap rock for the fill reconstruction site on Road I1 to I2 may be obtained from the Trailover Quarry located in the NE ¼, Section 14, T6N, R7W ” and “Stockpile Sites” on Exhibit A, or from other locations acceptable to STATE, as follows: Project No. 1: The ¾”-0”, 1½”-0”, and 4”-0” crushed rock may be obtained at the Trailover Quarry stockpile sites, located in the NE¼, Section 14, T6N, R7W. The 6”-0” pit-run rock, 24”-6” riprap rock and 36”-24” riprap rock may be obtained at the Trailover Quarry, located in the NE¼, Section 14, T6N, R7W. Required pit pit-run and riprap rock must shall be developed. developed and meet specifications in Exhibit E. Development and use of the rock quarries quarry shall be in accordance with Exhibit D. Project No. 4: The 4”-0” and 3/4”-0” crushed rock may be obtained from the Flat Iron Stockpile Site, located in Section 22, T4N, R7W. The 24”-12” riprap, and the 24”-6” rock may be obtained at the Sterling Ridge Quarry, located in Section 23, T4N, R7W. Required riprap rock shall be developed and meet specifications in Exhibit E. Development and use of the rock quarry shall be in accordance with Exhibit D. Project No. 1. Sale Access Road Construction, Road Improvement, and Landing Construction. Construct roads, improve roads, and construct landings at or between and at the following road points according to the specifications in Exhibits B, C, E, I, L, M, N, O, and EP: Construct: 1A to 1B, 1C to 1D, 1G to 1H, 1I to 1J, 1K to 1L, 1M to 1N, 2A to 2B, 2C to 2D, 2E to 2F, 2G to 2H, 2I to 2J, 2K to 2L, 2M to 2N, 2O to 2P, 2Q to 2R, 3A to 3B, and 4A to 4B. 4B, 4C to 4D, and 6A to 6B. Improve: I1 to I2. Landings: 1B, 1DI2 to I3, 1HI4 to I5, 1JI6 to I7, 1LI8 to I9, 1NI10 to I11, 1O, 1P, 2B, 2D, 2F, 2H, 2J, 2L, 2N, Stations 9+00 and 13+00 of 2M I12 to 2N, 2P, 2R, 2S, 3B, 3C, 3D, 4B, 4CI13, and 4D. Grass Seeding. Seed all areas of exposed soils resulting from road and landing construction, and road improvement including cut slopes, fill slopes, and waste areas in accordance with the specifications in Exhibit H. Right-of-Way Hauling. Prior I14 to approval to rock constructed roads, right-of-way logs shall be hauled, unless otherwise approved in writing by STATE. Project No. 2. Xxxxxx Quarry Development and Rock Crushing. Crush/develop the following quantities of rock:I15.

Appears in 1 contract

Samples: apps.odf.oregon.gov

Rock Source. The crushed road rock for Project Nos. 1 and 3 shall be produced with Project No. 2. Rock for Project No. 2 may be obtained from Hampton Tree Farms, Inc. STATE land at the location locations shown as Xxxxxx Quarry, located in the NE ¼, Section 34, T7N, R7W. Riprap rock for the fill reconstruction site on Road I1 to I2 may be obtained from the Trailover Quarry located in the NE ¼, Section 14, T6N, R7W "Rock Quarries" and "Stockpile Sites" on Exhibit A, or from other locations acceptable to STATE. Required pit , as follows: The ¾”-0” (except for Station 112+00 to 135+00 on Segment 3A to 3B), 1 ½”-0”and 4”-0” rock may be obtained from the Quartz Creek Stockpile sites, located in the SW¼ Section 15, T4N, R7W. The ¾”-0” rock for surfacing between Stations 112+00 to 135+00 on Segment 3A to 3B shall be obtained from the Flat Iron Stockpile site, located in the XX¼ Xxxxxxx 00, X0X, X0X. The 6”-0” pit-run rock may be obtained at the Spruce Run Quarry, located in the NW¼ Section 16, T4N, R7W. The 6”-2” pit-run rock and 24”-6” riprap rock may be obtained from the Sterling Ridge Quarry, located in the SE¼ Section 22, T4N, R7W. All required pit-run rock and riprap rock must shall be developed. developed and meet specifications in Exhibit E. Development and use of the rock quarries shall be in accordance with Exhibit D. Project No. 1. Sale Access Road Construction, Road Improvement, and Landing Construction. Construct roads, improve roads, and construct landings at or between and at the following road points according to the specifications in Exhibits B, C, D, E, F, K, L, M, and EN: Construct: 1A to 1B, 1C to 1D, 1G to 1H, 1I to 1J, 1K to 1L, 1M to 1N, 2A to 2B, 2C to 2D, 2E to 2F, 2G to 2H, 2I to 2J, 2K to 2L, 2M to 2N, 2O to 2P, 2Q to 2R, 3A to 3B, and 3C to 3D, 3E to 3F, 4A to 4B. 4B, 4D to 4E, 4F to 4G, and 4H to 4I. Improve: I1 to I2, I2 to I3, and I3 to I4. Landings: 1B, 1D, 1H, 1J, 1L, 1N, 1O, 1P, 2B, 2D, 2F, 2H, 2J, 2L, 2N, Stations 9+00 and 13+00 of 2M to 2N, 2P, 2R, 2S, 3B, 3C3D, 3D3F, 4B, 4C, and 4D. Grass Seeding. Seed all areas of exposed soils resulting from road and landing construction4E, 4G, and road improvement including cut slopes, fill slopes, and waste areas in accordance with the specifications in Exhibit H. Right-of-Way Hauling. Prior to approval to rock constructed roads, right-of-way logs shall be hauled, unless otherwise approved in writing by STATE. Project No. 2. Xxxxxx Quarry Development and Rock Crushing. Crush/develop the following quantities of rock:4I.

Appears in 1 contract

Samples: apps.odf.oregon.gov

Rock Source. The crushed required road rock for Project Nos. 1 1, 2, and 3 shall be produced with Project No. 2. Rock for Project No. 2 may be obtained from Hampton Tree Farms, Inc. land at the location shown as Xxxxxx Quarry, located in the NE ¼, Section 34, T7N, R7W. Riprap rock for the fill reconstruction site on Road I1 to I2 may be obtained from the Trailover Quarry located in the NE ¼, Section 14, T6N, R7W on Exhibit Alocations listed below, or from other locations acceptable to STATE: ¾”- 0” crushed rock: Knob Point Stockpile, located in the NW ¼, Section 18, T7N, R6W, and Cow Creek Stockpile, located in the NW ¼, Section 16, T6N, R6W. 1½”- 0” crushed rock: Xxxxx Xxxxxxxxx, located in the SE ¼, Section 21, T7N, R6W, and Xxxxxxxx Ridge Stockpile, located in the SE ¼, Section 17, T6N, R6W. 4”- 0” crushed rock: Knob Point Stockpile, located in the NW ¼, Section 18, T7N, R6W, and Cow Creek Stockpile, located in the NW ¼, Section 16, T6N, R6W. Pit-run and riprap rock: Knob Point Quarry, located in the NW ¼, Section 18, T7N, R6W, and Xxxxxxxx Ridge Quarry, located in the SE ¼, Section 17, T6N, R6W. Salvaged crushed rock from Project No. Required pit 4: Stockpile, located in the NW ¼, Section 9, T6N, R6W. Project No. 3: The required rock for crushing may be obtained from the Sterling Ridge Quarry located in the SW ¼, Section 23, T4N, R7W. The pit-run and riprap rock must be developed. Development and use of the rock quarries shall be in accordance with Exhibit D. Project No. 1. Sale Access Road Construction, Road Improvement, and Landing Construction. Construct roads, improve roads, and construct landings between and at the following road points according to the specifications in Exhibits B, C, E, F, H, and EI: Construct: 1A to 1B, 1C to 1D, 1G to 1H, 1I to 1J, 1K to 1L, 1M to 1N, 2A to 2B, 2C to 2D, 2E to 2F, 2G 2H to 2H, 2I to 2J, 2K to 2L, 2M to 2N, 2O to 2P, 2Q to 2R2I, 3A to 3B, and 3C to 3D, 3E to 3F, 3G to 3H, 3I to 3J, 3K to 3L, 4A to 4B. 4B, 5A to 5B, 5C to 5D, 5E to 5F, 6A to 6B, 6C to 6D, 6E to 6F, and 7A to 7B. Improve: I1 to I2I2 and I3 to I4. Landings: 1B, 1D, 1H, 1J, 1L, 1N, 1O, 1P, 2B, 2D, 2F, 2H, 2J, 2L, 2N, Stations 9+00 and 13+00 of 2M to 2N, 2P, 2R, 2S2I, 3B, 3C3D, 3D3F, 3H, 3J, 3L, 3M, 4B, 4C5B, 5D, 5F, 5G, Sta. 1+00 on 6A to 6B, 6B, 6D, 6F, 7B, and 4D. Grass Seeding. Seed all areas of exposed soils resulting from road and landing construction, and road improvement including cut slopes, fill slopes, and waste areas in accordance with the specifications in Exhibit H. Right-of-Way Hauling. Prior to approval to rock constructed roads, right-of-way logs shall be hauled, unless otherwise approved in writing by STATE. Project No. 2. Xxxxxx Quarry Development and Rock Crushing. Crush/develop the following quantities of rock:7C.

Appears in 1 contract

Samples: apps.odf.oregon.gov

AutoNDA by SimpleDocs

Rock Source. The crushed road rock for Project Nos. 1 and 3 shall be produced with Project No. 2. Rock for Project No. 2 may be obtained from Hampton Tree Farms, Inc. STATE land at the location shown as Xxxxxx "Quarry, located in the NE ¼, Section 34, T7N, R7W. Riprap rock for the fill reconstruction site on Road I1 to I2 may be obtained from the Trailover Quarry located in the NE ¼, Section 14, T6N, R7W " and "Stockpile Sites" on Exhibit A, or from other locations acceptable to STATE. , as follows: ¾”-0” and 1½”-0” crushed rock may be obtained at the Big Noise Stockpile Site, located in the NE1/4 of Section 25, T8N, R7W. 4”-0” crushed rock may be obtained at the Big Noise Stockpile Site, located in the SW1/4 of Section 36, T8N, R7W. The 6”-0” pit-run and 24”-6” riprap rock may be obtained at the Big Noise Quarry, located in the NW1/4 of Section 1, T7N, R7W. Required pit pit-run and riprap rock must shall be developed. developed and meet specifications in Exhibit D. Development and use of the rock quarries quarry shall be in accordance with Exhibit D. Project No. 1. Sale Access Road Construction, Road Improvement, and Landing Construction. Construct roads, improve roads, and construct landings between and at the following road points according to the specifications in Exhibits B, C, and E: Construct: 1A to 1B, 1C to 1D, 1G to 1H, 1I to 1J, 1K to 1L, 1M to 1N, 2A to 2B, 2C to 2D, 2E to 2F, 2G to 2H, 2I to 2J, 2K to 2L, 2M to 2N, 2O to 2P, 2Q to 2R, 3A to 3B, and 4A to 4B. Improve: I1 to I2. Landings: 1B, 1D, 1H, 1J, 1L, 1N, 1O, 1P, 2B, 2D, 2F, 2H, 2J, 2L, 2N, Stations 9+00 and 13+00 of 2M to 2N, 2P, 2R, 2S, 3B, 3C, 3D, 4B, 4C, and 4D. Grass Seeding. Seed all areas of exposed soils resulting from road and landing construction, and road improvement including cut slopes, fill slopes, and waste areas in accordance with the specifications in Exhibit H. Right-of-Way Hauling. Prior to approval to rock constructed roads, the right-of-way logs on those portions of road to be rocked shall be hauled, unless otherwise approved in writing by STATE. Project No. 21. Xxxxxx Quarry Development Timber Sale Access Road Construction, Road Improvement, Landing Construction, and Rock CrushingRoadside Brushing. Crush/develop Improve, brush, and construct roads and landings at or between the following quantities of rock:road points according to the specifications in Exhibits B, C, D, E, F, G, and H: Construct: 3A to 3B, 4A to 4B, and 5A to 5B. Improve: I1 to I3, I3 to I4, I5 to I6, I3 to I7, I7 to I8, I7 to I9, I9 to I10, I9 to I12, I11 to I12, I12 to I13, I14 to I15, I16 to I17, and I18 to I19. Landings: 3B, 4B, 5B, 15+40 on I12 to I13, and 18+00 on I16 to I17. Brush: I1 to I3, I3 to I4, I5 to I6, I3 to I7, I7 to I8, I7 to I9, I9 to I10, I9 to I12, I11 to I12, I12 to I13, I14 to I15, I16 to I17, and I18 to I19.