Removing Material Sample Clauses
The "Removing Material" clause defines the procedures and responsibilities related to the removal of materials from a project site or premises. Typically, this clause outlines which party is authorized to remove materials, under what conditions removal can occur, and any requirements for documentation or approval. For example, it may specify that only surplus or waste materials may be taken off-site, and only with the owner's consent. The core function of this clause is to prevent unauthorized removal of valuable or hazardous materials, thereby protecting the interests of the property owner and ensuring compliance with safety and environmental regulations.
Removing Material. Replace the fourth and fifth paragraphs with the following: Add the following:
Removing Material. UReplace the fourth and fifth paragraphs with the following: Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete. Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation. Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.
Removing Material. Do not permit debris to enter waterways, travel lanes open to public traffic, or areas designated not to be disturbed.
