Quality Control Program Plan Clause Samples
Quality Control Program Plan. The Contractor shall submit a Quality Control Program Plan in accordance with CDRL A007. This document shall address all aspects of manufacturing, testing, and inspection as specified in the TDP, SOW, and contract. The Quality Control Program Plan should also address other aspects where quality control interface is appropriate, such as the quality group’s input into purchasing decisions, and incoming receiving and inspection of material and components. The Contractor’s Quality Control Program Plan must be approved by the Government before fabrication or procurement of any product for eventual delivery. Acceptance of the Contractor’s quality control program shall not in any way relieve the Contractor of their responsibility for compliance with all contract requirements. All manufacturing, assembly, inspection, and testing shall adhere to the requirements of this document for the life of the contract. If any changes are made to the Quality Control Program Plan during the use of this contract, the Contractor shall notify the Government in writing of these changes.
Quality Control Program Plan. The Contractor shall organize, document, prepare procedures for, and implement a management- driven system to provide maximum assurance that products and services conform to specified requirements. Products and services submitted in the performance of this contract shall be according to the standards set forth by the American National Standard Institute/American Society for Quality, if applicable, or Best Commercial Practice, and contract requirements. All work accomplished by the Contractor shall be of sufficient quality and level of acceptance by federal, state, and local regulators. The Contractor shall provide a Quality Control Program Plan (QCPP) detailing the execution of this program. If the QCPP has already been prepared for a specific installation for the base year, the Contractor shall prepare an addendum to the existing approved plan in subsequent option years if applicable.
Quality Control Program Plan. A Quality Control Program Plan (CDRL A006) shall be written and submitted by the Contractor. This document shall address all aspects of production, testing, and inspection as called out in the product documentation, SOW, and contract. This document shall be submitted within 14 days of contract award. All production, inspection, and testing shall adhere to the requirements of this document for the life of the contract. If any changes are made to the Quality Control Program Plan within the duration of this contract, the Contractor shall notify the Government in writing of these changes. Changes to the Quality Control Program Plan may result in the necessity for additional First Article testing. This additional First Article sample and test series shall be at the Contractor’s expense.
Quality Control Program Plan. A Quality Control Program Plan shall be written and submitted by the Contractor. This document shall address all aspects of production, testing, and inspection as called out in the technical data package (drawing and weapon specification), SOW, and contract. All production, inspection, and testing shall adhere to the requirements of this document for the life of the contract. If any changes are made to the Quality Control Program Plan during the use of this contract, the Contractor shall notify the Government in writing of these changes. Changes to the Quality Control Program Plan may result in the necessity for additional First Article testing. This additional First Article sample and test series shall be at the Contractor’s expense. [A006]
