Common use of Project Facilities Clause in Contracts

Project Facilities. The Project includes an advance recycled water treatment plant, which is located at the SMWD’s Finisterra Recycled Water pump Station site. The plant with a design capacity of 600 AFY includes micro screens, microfiltration or ultrafiltration, reverse osmosis, ultraviolet irradiation, and chemical pH adjustment to reduce nitrogen loading to the lake. No storage feature is included in the plant because it is designed to provide peak summer demand to the lake. The brine from the plant is discharged either into an existing 12-inch sewer line, through a dedicated brine line that conveys the brine downstream of the plant, or a brine concentrator that reduces the water content of the brine.

Appears in 5 contracts

Samples: www.mwdoc.com, www.mwdoc.com, www.mwdoc.com

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.