Common use of Project Acceptance Clause in Contracts

Project Acceptance. 7.1 The following standards and methods are agreed by the two parties to be used to inspect the functional completion of the construction: 7.1.1 The items indicating as the functional completed of the constructions by Party B: (1) CDQ waste heat power generation: the power station can produce electricity normally; (2) Smoke pipeline waste heat recovery: supply steam gas pursing to the design requirements; 7.1.2 Functional completion and acceptance standards: refer to design requirement; 7.1.3 Acceptance for functional completion: Party B organizes and examines the constructional engineering and installation engineering involved into the project as well as assumes related expenses. The professional and government inspections and acceptance will be coordinated by Party A which will assume related expenses, including environmental protection, fire fighting, industrial hygiene, records, pressure vessel (boiler detection), electrical equipment, anti-thunder and hoisting equipment. 7.1.4 Acceptance time, date and personnel: within 15 days after Party B informs Party A that the power station is qualified for acceptance, both parties negotiate the place and personnel. 7.2 Party A cooperates with Party B to organize the construction contractor for project inspection and acceptance. If the equipment works 72 hours continually and the project is under stable operation, the project passes acceptance inspection. The project acceptance report should be signed by the supervisors and technicians of the both parties that participate the acceptance inspection as well as seals on the report by all entities participated in the acceptance inspection. The acceptance report should indicate the operational instrument data, operation state and instant effects. The acceptance inspection to CDQ waste heat power generation system and smoke pipeline waste heat utilization system can be conducted separately upon its completion. 7.3 The execution date of the acceptance report will be regarded as the date when the project is under stable operation state. Since then, the produced electricity and steam will be considered officially supplying to Party A.

Appears in 1 contract

Sources: Energy Management Cooperation Agreement (China Recycling Energy Corp)

Project Acceptance. 7.1 The following standards and methods are agreed by the two parties to be used to inspect the functional completion of the construction: 7.1.1 The items indicating as the functional completed of the constructions by Functional completion indicator for Party B: (1) : CDQ waste heat power generation: the power station can produce electricity normally; (2) Smoke pipeline waste heat recovery: supply steam gas pursing to the design requirements; 7.1.2 Functional completion and acceptance standardscriteria: refer to design requirementcriterion; 7.1.3 Acceptance measures for functional completion: Party B organizes is responsible for the examination and examines acceptance for the constructional engineering and installation engineering involved into the project as well as assumes related expenses. The professional Party A is responsible for the specialized and government inspections inspection and acceptance will be coordinated by Party A which will assume and assumes related expenses, including environmental protection, fire fighting, industrial hygiene, records, pressure vessel (boiler detection), electrical equipment, anti-thunder and hoisting equipment. 7.1.4 Acceptance Inspection and acceptance time, date and personnel: within 15 days after Party B informs Party A that the power station is qualified for acceptance, both parties negotiate the place and personnel. 7.2 Party A cooperates with Party B to organize the construction contractor agreementor for project inspection and acceptance. If the equipment works 72 hours continually and the project is under stable operation, the project passes acceptance inspection. The project acceptance report should shall be signed by the supervisors and technicians of the both parties that participate the acceptance inspection as well as seals on the report by all entities participated in the acceptance inspection. The acceptance report should indicate the operational instrument data, operation state and instant effects. The acceptance inspection to CDQ waste heat power generation system and smoke pipeline waste heat utilization system can be conducted separately upon its completion. 7.3 The execution date of the acceptance report will be regarded as the date when the project is under stable operation state. Since then, the produced electricity and steam will be considered officially supplying to Party A.

Appears in 1 contract

Sources: Emc Cooperation Agreement (China Recycling Energy Corp)

Project Acceptance. 7.1 8.1 The following standards and methods are agreed by the two parties to be used to inspect the functional completion of the construction: 7.1.1 The items indicating as the functional completed of the constructions by 8.1.1 Functional completion indicators for Party B: (1) The CDQ waste heat power generation: the power station can produce electricity normally; ; (2) Smoke pipeline the waste heat recovery: supply steam gas pursing to water treatment system operates normally and meet the design requirements;standards. 7.1.2 8.1.2 Functional completion and acceptance standardscriteria: refer to design requirementcriterion; 7.1.3 8.1.3 Acceptance measures for functional completion: Party B organizes is responsible for the examination and examines acceptance for the constructional engineering construction and installation engineering involved into of the project as well as and assumes related expenses. The professional Party A is responsible for the specialized and government inspections inspection and acceptance will be coordinated by Party A which will assume and assumes related expenses, including environmental protection, fire fighting, industrial hygiene, records, pressure vessel (boiler detection), electrical equipment, anti-thunder and hoisting equipment, while Party B shall provide assistance. 7.1.4 Acceptance 8.1.4 Inspection and acceptance time, date place and personnel: within 15 days after Party B informs Party A that the power station is qualified and waste water treatment system are in the conditions ready for acceptance, ; both parties negotiate determine the place and personnel. 7.2 8.2 Party A cooperates with shall take the lead and Party A shall assist Party B to organize the construction contractor for project inspection and acceptance. If the equipment system works properly for 72 hours continually and the project is under stable operationconsecutive hours, the project passes acceptance inspection. The project acceptance report should shall be signed by the supervisors and technicians of the both parties that who participate the acceptance inspection as well as seals on from both parties and sealed with the report by all entities participated in the acceptance inspectionparties' chops. The acceptance report should indicate the operational instrument data, operation state status and instant effects. The acceptance inspection to CDQ waste heat power generation system and smoke pipeline waste heat utilization system can be conducted separately upon its completion. 7.3 8.3 The execution date of the acceptance report will be regarded as the date when the project is under stable operation statestatus. Since then, the The electricity produced electricity and steam will be considered officially supplying being supplied to Party A.

Appears in 1 contract

Sources: Energy Management Cooperation Agreement (China Recycling Energy Corp)