Program Facilities Sample Clauses

Program Facilities a. Program Facilities are defined as parking locations that are docking or lock- to compliant for fleet vehicles and may include traditional bike share docking stations, on street corral facilities (as defined by the City’s on street corral program), charging facilities, lightweight non-anchored sidewalk facilities, meter hitches, and permanent sidewalk rack facilities. b. Licensee will install, operate, and maintain the Program Facilities with the terms of this License, either as proposed in Licensee’s Facility Form or as agreed through programmatic discussion. c. Licensee will purchase, own, rent or contract for the use of the equipment required to construct any Program Facilities. d. Licensee will obtain necessary leases, licenses, permits, or other authorizations for the real property upon which Licensee will install, equip, own, maintain, and operate the Facilities including but not limited to: o Application shall be made and shall contain such information as may be required by the City's Director of Public Works. The applicant shall agree in making application for a permit to remove the Program Facility upon request at no cost to the City. The applicant shall attach to the application a fully detailed sketch or plan showing the dimensions of the Program Facility, the adjoining street and sidewalk, all posts and fixtures in the adjoining sidewalk, and all structures, fixtures, or buildings on abutting land. The Department of Public Works shall review the application and plan, and issue approval or denial. o Receipt of legal authority in the form of a permit to install Program Facilities in public right of way or private property. o All City-permitted Program Facilities must be clearly identified and show if they are branded or unbranded facilities. All Program Facilities must follow the City’s design specifications. o Licensee must provide advance notice of installation and removal of Program Facilities. Additionally, Licensee must provide monthly updates on the location of their Program Facilities on the 1st day of every month. o Landscaping and site restoration requirements have been completed in accordance with Program Facility plans. o The City has received or shall simultaneously receive a lien waiver from each contractor, subcontractor, or materials supplier for all work finished and for all materials furnished by it for the Program and Facilities, or such liens have been bonded to the satisfaction of the City. o Seasonal removal and reinstallat...
Program Facilities. A list of those Clubs within such Area at which Continucareproposes Program Facilities should be established.
Program Facilities 

Related to Program Facilities

  • New Facilities For all new Generating Facilities to be interconnected pursuant to the Tariff, other than wind- powered and other non-synchronous generation facilities, the Generation Interconnection Customer shall design its Customer Facility to maintain a composite power delivery at continuous rated power output at a power factor of at least 0.95 leading to 0.90 lagging. For all new wind- powered and other non-synchronous generation facilities the Generation Interconnection Customer shall design its Customer Facility with the ability to maintain a composite power delivery at a power factor of at least 0.95 leading to 0.95 lagging across the full range of continuous rated power output. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after November 1, 2016, the power factor requirement shall be measured at the high-side of the facility substation transformers. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after May 1, 2015, and before November 1, 2016, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of more than 20 MW, other than wind- powered and other non-synchronous Generating Facilities, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of 20 MW or less, and all wind-powered and other non-synchronous generation facilities entering the New Service Queue prior to May 1, 2015, the power factor requirement shall be measured at the Point of Interconnection. Any different reactive power design criteria that Transmission Provider determines to be appropriate for a wind-powered or other non-synchronous generation facility shall be stated in the Interconnection Service Agreement. A Transmission Interconnection Customer interconnecting Merchant D.C. Transmission Facilities and/ or Controllable A.C. Merchant Transmission Facilities shall design its Customer Facility to maintain a power factor at the Point of Interconnection of at least 0.95 leading and 0.95 lagging, when the Customer Facility is operating at any level within its approved operating range.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to GNAPS.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Laundry Facilities Washers and dryers are installed in each apartment for the exclusive use of students in the apartment. Any other use is prohibited. The use of washers and dryers are free. LINEN: Brighton provides a mattress cover on all mattresses. Students need to bring their own bedding. All beds are regular twin size. The typical cost for replacing a mattress cover is $25.00. MAINTENANCE: Students are responsible to notify the manager in writing as soon as possible if they notice anything in an apartment that requires repair work or maintenance. See “Property Conditions” section 12 of the BYU-Idaho Student Landlord Housing Contract.

  • Existing Facilities Each of the Existing Facilities shall be repaid in full and terminated and all collateral security therefor shall be released, and the Administrative Agent shall have received pay-off letters in form and substance satisfactory to it evidencing such repayment, termination and release.