Program Data Management and Integration Clause Samples

Program Data Management and Integration. 1.3.2.1 Programmatically, the contractor shall maintain and implement an AS9100 compliant data management system in accordance with SSP 50010 and SSP 41170, and assure the requirements and processes are implemented across the program. The contractor shall: 1.3.2.1.1 Update and maintain the SSP 50573, Program Documentation Tree. 1.3.2.1.2 Update and maintain the ISSP technical documentation baseline in PALS (or equivalent) and COSMOS. 1.3.2.1.3 Maintain the ISSP Master List of work instructions, processes, and procedures in accordance with AS9100, Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation, and Servicing. 1.3.2.1.4 Provide Data Requirement (DR) receipt, tracking, monitoring, reporting, validation, evaluation, distribution, status, and storage of ISSP contracts deliverables and IP/P data deliverables incoming to the ISSP as identified in the following Bilateral Data Exchange Agreements, Lists and Schedules (BDEALS) and Bilateral Hardware and Software Exchange Agreements, List, and Schedules (BHSEALS) documents: SSP 50124, NASA/7 CSA BDEALS; Contract NNJ04AA01C PROGRAM INTEGRATION AND CONTROL Attachment ▇-▇ Mod 7 SSP 50126, NASA/NASDA BDEALS; SSP 50127, NASA/ESA BDEALS; SSP 50137, NASA/RSA BDEALS; SSP 50407, NASA/ESA BDEALS for Cupola 1; SSP 50611, NASA/ESA BDEALS for ATV; SSP 50614, NASA/HTV BDEALS for HTV; and SSP 50617, NASA/NASDA BDEALS for CAM; and ; SSP 50352, NASA/AEB BDEALS; and SSP 50648, NASA/AEB BHSEALS. 1.3.2.1.5 Manage and operate the International Partner library (IOMS or equivalent). Contents of the library shall include, but are not limited to, the following: translated Russian documents; Bilateral Data Exchange Agreements and Lists (BDEALS) data; NAS15-10110 Contract deliverables; Government Furnished Data (GFD) deliverables; IP protocols; IP safety data packages; hazard reports; drawings; film; videos; photos; faxes; and letters. The contractor shall be able to access and provide requested materials/information within two business days. The PI&C contractor shall perform the following Data Management activities in accordance with SSP 41170 and SSP 50010 specific to the PI&C contract: 1.3.2.1.6 Provide an Engineering Release Unit (ERU) in accordance with SSP 50123 for release of ISSP baseline documentation. 1.3.2.1.7 Operate a Configuration Management Receipt Desk (CMRD) in accordance with SSP 50123. 1.3.2.1.8 Provide Document Quality Assurance (DQA) in accordance with SSP 50010 f...

Related to Program Data Management and Integration

  • Data Management Contractor will not use State data, including production data, for testing or development purposes unless authorized in writing by the State Chief Information Security Officer or delegate. Contractor will implement and maintain procedures to physically and logically segregate State data, unless otherwise explicitly authorized by the State Chief Information Security Officer or delegate.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Project Management Plan Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan and

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following: