Common use of Process Equipment Clause in Contracts

Process Equipment. The ▇▇▇ ▇▇▇▇▇▇▇ Company, Cimbria Sket and Westfalia will provide the process equipment. The ▇▇▇ ▇▇▇▇▇▇▇ Company will erect all equipment in the process structure. Piping of the process equipment and utilities, instrumentation mounting and wiring will be the responsibility of the ▇▇▇▇▇ Group of Des Moines, IA, a strategic partner of The ▇▇▇ ▇▇▇▇▇▇▇ Company. Tanks located in the tank farms will be provided and installed by The ▇▇▇ ▇▇▇▇▇▇▇ Company. These tanks will include appropriate foundations, piping, pipe insulation, tank insulation and painting as required. Tanks will be constructed of stainless steel and carbon steel to meet API 650 Code. Non-insulated stainless steel tanks will not be painted. Tanks that are heated will also be insulated. Pipe racks will be furnished as required from the rail loading and un-loading to the tank farm and from the tank farm into the process building. Pipe racks will also service the truck loading and unloading area as required and pipe racks will be sized for future four (4) 6” lines. The ▇▇▇ ▇▇▇▇▇▇▇ Company will construct the tank farm containment for the tanks. Containment will include the earthen berms, the containment walls, stabilized containment floors, finished surface gravel inside the containment dikes and final grading after erection of the field built tanks. One end of the containment dike will be left open to grade for access to construct the field build tanks. Tank foundations (by The ▇▇▇ ▇▇▇▇▇▇▇ Company) will be constructed after the tank farm containment is completed. All pressure vessels will be constructed to meet ASME as a minimum. Some vessels will be constructed in Germany per comparable German code and the ASME code. Soy Energy, LLC 06/19/2007 Page 6 of 10 Revision #01 As many of the pumps, valves, fittings, and instruments as possible will be purchased in the U.S. of performance quality equal to, or better than, comparable products available in Germany. All equipment and construction will have a minimum of a one-year mechanical warranty in force. Process piping will be specified, procured, installed and tested per ANSI B31-1 or ANSI B31-3 codes.

Appears in 2 contracts

Sources: Design Build Agreement (Soy Energy, LLC), Design Build Agreement (Soy Energy, LLC)