Process Equipment Sample Clauses

Process Equipment. The Xxx Xxxxxxx Company, Cimbria Sket and Westfalia will provide the process equipment. The Xxx Xxxxxxx Company will erect all equipment in the process structure. Piping of the process equipment and utilities, instrumentation mounting and wiring will be the responsibility of the Xxxxx Group of Des Moines, IA, a strategic partner of The Xxx Xxxxxxx Company. Tanks located in the tank farms will be provided and installed by The Xxx Xxxxxxx Company. These tanks will include appropriate foundations, piping, pipe insulation, tank insulation and painting as required. Tanks will be constructed of stainless steel and carbon steel to meet API 650 Code. Non-insulated stainless steel tanks will not be painted. Tanks that are heated will also be insulated. Pipe racks will be furnished as required from the rail loading and un-loading to the tank farm and from the tank farm into the process building. Pipe racks will also service the truck loading and unloading area as required and pipe racks will be sized for future four (4) 6” lines. The Xxx Xxxxxxx Company will construct the tank farm containment for the tanks. Containment will include the earthen berms, the containment walls, stabilized containment floors, finished surface gravel inside the containment dikes and final grading after erection of the field built tanks. One end of the containment dike will be left open to grade for access to construct the field build tanks. Tank foundations (by The Xxx Xxxxxxx Company) will be constructed after the tank farm containment is completed. All pressure vessels will be constructed to meet ASME as a minimum. Some vessels will be constructed in Germany per comparable German code and the ASME code. Soy Energy, LLC 06/19/2007 Page 6 of 10 Revision #01 As many of the pumps, valves, fittings, and instruments as possible will be purchased in the U.S. of performance quality equal to, or better than, comparable products available in Germany. All equipment and construction will have a minimum of a one-year mechanical warranty in force. Process piping will be specified, procured, installed and tested per ANSI B31-1 or ANSI B31-3 codes.
AutoNDA by SimpleDocs
Process Equipment. There is no process equipment in this area. 9.4.2
Process Equipment. Tenant elected to have Landlord install the ----------------- Process Equipment pursuant to Section 2(d)(iv) of the Original Lease. Landlord confirms that it has received full payment in respect of the Process Equipment, and no Rent or other payments are due from Tenant in respect thereof. The Process Equipment shall be the property of Tenant and subject to the provisions of Section 7(c) of the Original Lease.
Process Equipment. (i) Landlord and Tenant acknowledge that the machinery and equipment described on Exhibit "D" attached hereto and by this reference made a part hereof (the "Process Equipment") has been designed and manufactured at Tenant's request and is essential to the conduct and performance of Tenant's business to be conducted on the Premises. Landlord and Tenant understand and agree that, subject to the provisions of subparagraph 2(d)(iv) hereof, Tenant shall be solely responsible for installing the Process Equipment in the Building pursuant to the working drawings and blueprints listed on Exhibit "E" attached hereto and by this reference made a part hereof (the "Process Equipment Plans").
Process Equipment. All process equipment installed on board the FPSO to separate, treat and process the fluid stream (Crude Oil and other liquids) received by the FPSO into Processed Oil and liquid waste and gases and the compression of natural gas, as needed, the design and specification of which is described in the Specifications.
Process Equipment. There is no process equipment in this area. In-floor pulper loading conveyors start in this area but are included in the recycled fiber plant area.
Process Equipment. Detailed descriptions of the equipment are given in the vendor proposals.
AutoNDA by SimpleDocs
Process Equipment. EXHIBIT 1 - SCOPE OF WORK -------------------------------------------------------------------------------- There is no process equipment in this area. Shop equipment is included in Section 10.3 Architectural.
Process Equipment 

Related to Process Equipment

  • Contractor’s Equipment Payment for required equipment owned by the Construction Manager or an affiliate of the Construction Manager will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the Government will be based on one-half the derived hourly rate under this subsection.

  • Customer Equipment Customer represents and warrants that it owns or has the legal right and authority, and will continue to own or maintain the legal right and authority during the term of this Agreement, to place and use the Customer Equipment as contemplated by this Agreement. Customer further represents and warrants that its placement, arrangement, and use of the Customer Equipment in the Internet Data Centers complies with the Customer Equipment Manufacturer's environmental and other specifications.

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • New Equipment Where new types of equipment and/or operations, for which rates of pay are not established by this Agreement, are put into use after the ratification date of this Agreement within operations covered by this Agreement, rates governing such operations shall be subject to negotiations between the parties. This paragraph shall apply to all new types of equipment including office and clerical equipment. In the event agreement cannot be reached within sixty (60) days after the date such equipment is put into use, the matter may be submit- xxx to the National Grievance Committee for final disposition. Rates agreed upon or awarded shall be effective as of the date equipment is put to use.

  • Equipment and Materials Contractor at its sole cost and expense shall provide and furnish all tools, labor, materials, equipment, transportation services and any other items (collectively, "Equipment") which are required or necessary to perform the Services in a manner which is consistent with generally accepted standards of the profession for similar services. Notwithstanding the foregoing, District shall not be responsible for any damages to persons or property as a result of the use, misuse or failure of any Equipment used by Contractor of the Contracted Parties, even if such Equipment is furnished, rented or loaned to Contractor or the Contracted Parties by District. Furthermore, any Equipment or workmanship that does not conform to the regulations of this Agreement may be rejected by District and in such case must be promptly remedied or replaced by Contractor at no additional cost to District and subject to District’s reasonable satisfaction.

  • Equipment and Software To use the Mobile Remote Deposit Services, you must obtain and maintain at your expense, compatible equipment and software that we may specify from time to time.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Tenant’s Equipment Tenant shall provide notice to Landlord prior to moving any heavy machinery, heavy equipment, freight, bulky matter or fixtures (collectively, “Equipment”) into or out of the Building and shall pay to Landlord any costs actually incurred by Landlord in connection therewith. If such Equipment requires special handling, Tenant agrees (a) to employ only persons holding all necessary licenses to perform such work, (b) all work performed in connection therewith shall comply with all applicable Requirements and (c) such work shall be done only during hours designated by Landlord.

  • Equipment Use Lessee agrees that the Equipment will be operated by competent, qualified personnel in connection with Lessee's business for the purpose for which the Equipment was designed and in accordance with applicable operating instructions, laws, and government regulations, and that Lessee shall use all reasonable precautions to prevent loss or damage to the Equipment from fire and other hazards. Lessee shall procure and maintain in effect all orders, licenses, certificates, permits, approvals, and consents required by federal, state, or local laws or by any governmental body, agency, or authority in connection with the delivery, installation, use, and operation of the Equipment.

  • Test equipment For the tests an inertia dynamometer shall be equipped with the vehicle brake in question. The dynamometer shall be instrumented for continuous recording of rotational speed, brake torque, pressure in the brake line, number of rotations after brake application, braking time and brake rotor temperature.

Time is Money Join Law Insider Premium to draft better contracts faster.