Process Equipment Sample Clauses
The 'Process Equipment' clause defines the requirements and specifications for machinery, tools, and devices used in a particular process or project. It typically outlines the standards for equipment quality, installation, maintenance, and compliance with relevant regulations. For example, it may require that all equipment be certified, regularly inspected, and maintained according to manufacturer guidelines. The core function of this clause is to ensure that all process equipment is safe, reliable, and suitable for its intended use, thereby minimizing operational risks and ensuring project efficiency.
POPULAR SAMPLE Copied 1 times
Process Equipment. The ▇▇▇ ▇▇▇▇▇▇▇ Company, Cimbria Sket and Westfalia will provide the process equipment. The ▇▇▇ ▇▇▇▇▇▇▇ Company will erect all equipment in the process structure. Piping of the process equipment and utilities, instrumentation mounting and wiring will be the responsibility of the ▇▇▇▇▇ Group of Des Moines, IA, a strategic partner of The ▇▇▇ ▇▇▇▇▇▇▇ Company. Tanks located in the tank farms will be provided and installed by The ▇▇▇ ▇▇▇▇▇▇▇ Company. These tanks will include appropriate foundations, piping, pipe insulation, tank insulation and painting as required. Tanks will be constructed of stainless steel and carbon steel to meet API 650 Code. Non-insulated stainless steel tanks will not be painted. Tanks that are heated will also be insulated. Pipe racks will be furnished as required from the rail loading and un-loading to the tank farm and from the tank farm into the process building. Pipe racks will also service the truck loading and unloading area as required and pipe racks will be sized for future four (4) 6” lines. The ▇▇▇ ▇▇▇▇▇▇▇ Company will construct the tank farm containment for the tanks. Containment will include the earthen berms, the containment walls, stabilized containment floors, finished surface gravel inside the containment dikes and final grading after erection of the field built tanks. One end of the containment dike will be left open to grade for access to construct the field build tanks. Tank foundations (by The ▇▇▇ ▇▇▇▇▇▇▇ Company) will be constructed after the tank farm containment is completed. All pressure vessels will be constructed to meet ASME as a minimum. Some vessels will be constructed in Germany per comparable German code and the ASME code. Soy Energy, LLC 06/19/2007 Page 6 of 10 Revision #01 As many of the pumps, valves, fittings, and instruments as possible will be purchased in the U.S. of performance quality equal to, or better than, comparable products available in Germany. All equipment and construction will have a minimum of a one-year mechanical warranty in force. Process piping will be specified, procured, installed and tested per ANSI B31-1 or ANSI B31-3 codes.
Process Equipment. There is no process equipment in this area.
Process Equipment. There is no process equipment in this area. In-floor pulper loading conveyors start in this area but are included in the recycled fiber plant area.
Process Equipment. (i) Landlord and Tenant acknowledge that the machinery and equipment described on Exhibit "D" attached hereto and by this reference made a part hereof (the "Process Equipment") has been designed and manufactured at Tenant's request and is essential to the conduct and performance of Tenant's business to be conducted on the Premises. Landlord and Tenant understand and agree that, subject to the provisions of subparagraph 2(d)(iv) hereof, Tenant shall be solely responsible for installing the Process Equipment in the Building pursuant to the working drawings and blueprints listed on Exhibit "E" attached hereto and by this reference made a part hereof (the "Process Equipment Plans").
(ii) Pursuant to the Development Schedule, the installation of the Process Equipment is not designated a Key Task or Benchmark Task. Landlord and Tenant understand and agree, however, that in the event Tenant elects to have Landlord install the Process Equipment, the failure to install the Process Equipment by the date designated on the Development Schedule shall allow Tenant to avail itself of the options and remedies to which it would otherwise be entitled due to the failure to complete a Key Task by a Key Date, provided such delay is not caused by any of the reasons specified in subparagraph 2(c) hereof.
(iii) Upon receipt of Tenant's written notice, Landlord will allow Tenant reasonable access to the Premises to install and test the Process Equipment, provided Tenant first complies with the insurance provisions applicable to Tenant's early entry set forth in Paragraph 9 hereof and provided further that Tenant shall pay Landlord, in addition to the rent otherwise payable hereunder, a monthly sum for such early entry (the "Early Entry Rent") equal to one-half (1/2) of the difference between the monthly rent payable for the entire Premises during the first twelve (12) months following the Occupancy Date (as hereinafter defined) and the monthly Warehouse Rent (as hereinafter defined). The Early Entry shall commence upon the later of the Commencement Date or ten (10) days following the notice provided for in the first sentence of this subparagraph 2(d)(iii) and shall be paid as provided for payment of Rent; provided, however, that Tenant shall only be obligated to pay Early Entry Rent for the period of time between the date of Tenant's Early Entry and the Occupancy Date. Tenant shall perform the installation of the Process Equipment diligently and in a good and workmanlike manner in...
Process Equipment. Tenant elected to have Landlord install the ----------------- Process Equipment pursuant to Section 2(d)(iv) of the Original Lease. Landlord confirms that it has received full payment in respect of the Process Equipment, and no Rent or other payments are due from Tenant in respect thereof. The Process Equipment shall be the property of Tenant and subject to the provisions of Section 7(c) of the Original Lease.
Process Equipment. EXHIBIT 1 - SCOPE OF WORK -------------------------------------------------------------------------------- There is no process equipment in this area. Shop equipment is included in Section 10.3 Architectural.
Process Equipment. All process equipment installed on board the FPSO to separate, treat and process the fluid stream (Crude Oil and other liquids) received by the FPSO into Processed Oil and liquid waste and gases and the compression of natural gas, as needed, the design and specification of which is described in the Specifications.
Process Equipment. Detailed descriptions of the equipment are given in the vendor proposals.
Process Equipment