Preliminary Bridge Layouts Sample Clauses

Preliminary Bridge Layouts. 1.1.9. Comprehensive Map of all Utilities within the Project Area
AutoNDA by SimpleDocs
Preliminary Bridge Layouts. 1.15. Exhibit A Documents for Railroad Coordination

Related to Preliminary Bridge Layouts

  • Preliminary 4. The business of the Company may be commenced at any time after incorporation.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Specific Preliminaries C1. Proprietary branded products The contractor shall take delivery of, handle, store, use, apply and/or fix all proprietary branded products in strict accordance with the manufacturer's instructions after consultation with the manufacturer's authorised representative. 95 F: ……….… V: ….……… T: ….……... Item C2. Trade Names, etc. All materials, fittings, finishings, etc., specified hereinafter under a trade name, catalogue number or reference, must be exactly as described. The Architect's approval in writing must be obtained for the use of any alternative to the specification before the submission of tenders otherwise the specified materials, fittings, finishings, etc., will be assumed to have been allowed for in the tender. The Contractor must take delivery of, handle, store, use, apply and/or fix all proprietary branded products in strict accordance with the manufacturer's instructions after consultation with the manufacturer's authorised representative. 96 F: ……….… V: ….……… T: ….……... Item C3. Contractors responsibility The Employer, the Principal Agent and the other professional consultants shall not be responsible for any act or omission on the part of the Contractor which may result in any patent or latent defects, in materials or workmanship, breach or neglect of any local regulations. The Contractor shall at all times be responsible for any such neglect, deviation or wrong act, whether the same is discovered before or after the final certificate, or any other Certificate, has been approved. 97 F: ……….… V: ….……… T: ….……... Item Carried to Collection R Section 1 Bill No. 1 Preliminaries C4. Overtime Should overtime be required to be worked for any reason whatsoever, the costs of such overtime are to be borne by the contractor unless the principal agent has specifically authorised in writing, prior to the execution thereof, that costs for such overtime are to be borne by the employer. 98 F: ……….… V: ….……… T: ….……... Item

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Preliminary Approval Within a reasonable time after execution of this Settlement Agreement by the Parties, Plaintiff shall apply to the Court for the entry of an Order:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Preliminaries Where prices are submitted by the contractor or nominated/selected sub contractor during the progress of the works in respect of contract instructions or in regard to a claim under the terms of the contract and notwithstanding the fact that such prices may be used in an interim payment certificate, there is to be no presumption of acceptance. Should the principal agent wish to accept any such prices prior to the issue of the final certificate, it will be in writing. Clause 31.9 is amended as follows: Payment shall be subject to the Employer giving the Contractor a Tax Invoice for the amount due. The Employer undertakes to ensure compliance with the administrative requirements of Sections 20 (2) and 21 (4) of the Value Added Tax Act (Act 89 of 1991). The Contractor agrees to the adoption of the self invoicing procedures and undertakes not to issue any tax invoices, debit or credit notes in respect of any transaction included in the Tax Invoices issued by the Employer. The above clauses shall constitute a written agreement between the parties as required in terms of the Value Added Tax Act (Act 89 of 1991).' 30 F: ……….… V: ….……… T: ….……... Item Adjustment to the contract value (Clause 32). 31 F: ……….… V: ….……… T: ….……... Item Recovery of expense and loss (Clause 33). 32 F: ……….… V: ….……… T: ….……... Item Final account and final payment (Clause 34). 33 F: ……….… V: ….……… T: ….……... Item Payment to other parties (Clause 35). 34 F: ……….… V: ….……… T: ….……... Item Carried to Collection R Section 1 Bill No. 1 Preliminaries R CANCELLATION Cancellation by Employer - Contractor's default (Clause 36). 35 F: ……….… V: ….……… T: ….……... Item Cancellation by Employer - Loss and damage (Clause 37). 36 F: ……….… V: ….……… T: ….……... Item Cancellation by Contractor - Employer's default (Clause 38). 37 F: ……….… V: ….……… T: ….……... Item Cancellation - Cessation of the works (Clause 39). 38 F: ……….… V: ….……… T: ….……... Item DISPUTE Dispute Settlement (Clause 40) 39 F: ……….… V: ….……… T: ….……... Item SUBSTITUTE PROVISIONS State Clauses (Clause 41) 40 F: ……….… V: ….……… T: ….……... Item CONTRACT VARIABLES The Schedule: Pre-Tender information (Clause 42). 41 F: ……….… V: ….……… T: ….……... Item Carried to Collection Section 1 Bill No. 1 Preliminaries

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

Time is Money Join Law Insider Premium to draft better contracts faster.