PPAP Requirements Bubbled Drawing Sample Clauses
PPAP Requirements Bubbled Drawing. Specifications on the drawing are numbered and circled. The numbered sequence is used to document the specification and results in the Dimensional Results (ISIR) tab of the PPAP workbook. PPAP parts shall be taken from a significant run. This production run shall be manufactured at the production site, at the production rate, using the production tooling, gaging, process, materials, and operators. Parts from each unique production process stream shall be measured and representative parts tested. The sample quantity for PPAP will be agreed to with the PPAP coordinator. Measurement results are recorded according to the sequence of the bubbled drawing in the PPAP Workbook. A 30 piece capability study or otherwise agreed upon qualification method is required for Critical or Major specifications on the print or key quality features specified by Snap-on personnel. Any results that are outside specifications are cause for the supplier not to ship components. Every effort shall be made to correct the process so that all design record requirements are met. If the supplier is unable to meet any of these requirements, Snap-on shall be contacted for determination of appropriate corrective action.
