Common use of Potholing Clause in Contracts

Potholing. 4.1 The Consultant shall excavate sufficient potholes to verify locations and elevations at utility crossings and existing piping to be removed or replaced in the Project. These potholes may be made using small diameter vacuum-type equipment, if appropriate. 4.1.1 The Consultant shall obtain authorization from The City’s Project Manager prior to excavating additional potholes. 4.1.2 The Consultant shall notify the City immediately of any damage caused to the pipe during potholing activities. 4.1.3 The Consultant shall provide all services related to the excavation and backfilling of potholes. Pothole excavations shall be in compliance with CAL-OSHA and City safety requirements, and any excavations left open shall be covered with steel plates. The Consultant and excavation contractor shall be responsible for restoration and clean-up of all work sites. 4.1.4 All utility excavations shall be tied to the horizontal and vertical control information provided by the City’s survey for this project. A summary shall be provided to include:

Appears in 2 contracts

Sources: Design Professional Services Agreement, Design Professional Services Agreement