Post-completion test procedures Sample Clauses

Post-completion test procedures. 10.2.1 The contract letting party shall organize and arrange its management persons, operators, maintenance persons and all other preparation work according to the post-completion test scheme approved by the united coordinating and leading organ.
AutoNDA by SimpleDocs
Post-completion test procedures. 10.2.1 The Employer shall, in accordance with the post-completion test plan approved by the joint coordinating and leading organization, provide the electricity, water, fuel, power, raw materials, auxiliary materials, consumable materials and other test conditions, and organize and arrange its management personnel, operation and maintenance personnel and other preparations.
Post-completion test procedures. Agreement on start date of post-completion test for single project or and the project: None.

Related to Post-completion test procedures

  • Test Procedures For an Asset Review, the Asset Representations Reviewer will perform for each Asset Review Receivable the procedures listed under “Procedures to be Performed” in Schedule A for each representation and warranty (each, a “Test”), using the Asset Review Materials listed for each such Test in Schedule A. For each Test and Asset Review Receivable, the Asset Representations Reviewer will determine if the Test has been satisfied (a “Test Pass”) or if the Test has not been satisfied (a “Test Fail”).

  • Test procedure The engine speed shall be gradually increased from idle to the target engine speed, not exceeding the tolerance band of ±3 per cent of the target engine speed, and held constant. Then the throttle control shall be rapidly released and the engine speed shall be returned to idle. The sound pressure level shall be measured during a period of operation consisting of a maintaining constant engine speed of 1 second and throughout the entire deceleration period. The maximum sound level meter reading during this period of operation, mathematically rounded to the first decimal place, is taken as the test value.

  • Conformity Assessment Procedures 1. The Parties recognise that a broad range of mechanisms exist to facilitate the acceptance of conformity assessment results, including:

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • Procurement procedures 11.1 The Recipient must secure the best value for money and shall act in a fair, open and non-discriminatory manner in all purchases of goods and services.

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Acceptance Test 7.1 Before delivering the Goods or Articles upon completion of the Services, the Seller shall carefully inspect and test them for compliance with the Specification. The Seller shall, if required by the Buyer, give the Buyer reasonable notice of such test and the Buyer shall be entitled to be represented thereat. The test shall hereinafter be referred to as the “Acceptance Test”.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.