PDCA cycle. Figure 23 PDCA cycle (Project steps blogspot website, 2009)
PDCA cycle. I. Step 1) PLAN Planning is the most important phase of determining the strategy of doing almost anything in software development. Before the creating a plan it is vital to determine the procedure for doing the interoperability testing; for that, it is imperial that each application or system deployed in the network is understood. For all applications information about the functionality, behaviour, input it takes and output it reveals should be gathered. A standard Test Plan document is used and tailor it a bit as per the requirement to document the planning of IOT. Thereafter the test conditions are derived. The focus of deriving your test condition should not be limited to the individual applications; instead it should be based on the flow of data through all the applications. The conditions should be designed in such a way that, if not all, but most of the applications in the network are traversed. In the next step, the tests are carried out. It is also possible to create a RTM (Requirements Traceability Matrix) to map your test cases with test conditions and your test conditions with acceptance test conditions/requirements. When working on a network, it is important to plan for the Non Functional testing activities as well. It is mandatory to check for the non-functional aspects of the system as a whole. These non-functional areas would include performance and security. If required a separate plan for Functional testing, performance testing and Security testing; or create a single plan and different document of test conditions for each of these testing types can be established.
PDCA cycle. 59 5.1.5 Lean management 60 5.1.6 Pull replaces push 61