Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones:
Target Population The Grantee shall ensure that diversion programs and services provided under this grant are designed to serve juvenile offenders who are at risk of commitment to Department.
Teaching Load Full teaching assignments shall normally include 12 course credit hours of scheduled teaching per academic quarter. A reassignment of duty, for the equivalent of 3 or 4 credit course, shall be provided during one term of the first academic year to all newly hired tenure track faculty to further their teaching, scholarship and service and to encourage faculty retention. Wherever possible the University will endeavor to arrange teaching schedules that avoid excessive numbers of preparations and recognize evening and/or off-campus assignments. Class sizes will be established and monitored by the appropriate academic xxxx in consultation with division chairs and affected faculty each term. The following equivalencies will be used in determining teaching assignments:
Exclusion Criteria Subjects fulfilling any of the following criteria are not eligible for participation in this study.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.