OCP Clause Samples
POPULAR SAMPLE Copied 1 times
OCP. Constructor shall provide an Owners' and Contractors' Protective Liability Insurance (“OCP”) policy with limits equal to the limits on Commercial General Liability Insurance required by Exhibit D, or limits as otherwise required by Owner. Any documented additional cost in the form of a surcharge associated with procuring the additional liability coverage in accordance with this Subparagraph shall be paid by the Owner directly or the costs may be reimbursed by Owner to Constructor by increasing the contract price to correspond to the actual cost required to purchase and maintain the additional liability coverage. Prior to commencement of the Work, Constructor shall obtain and furnish to the Owner a certificate evidencing that the additional liability coverages have been procured. ROYALTIES, PATENTS AND COPYRIGHTS The Constructor shall pay all royalties and license fees which may be due on the inclusion of any patented or copyrighted materials, methods or systems selected by the Constructor and incorporated in the Work. The Constructor shall indemnify and hold the Owner harmless from all suits or claims for infringement of any patent rights or copyrights arising out of such selection. The Owner agrees to indemnify and hold the Constructor harmless from any suits or claims of infringement of any patent rights or copyrights arising out of any patented or copyrighted materials, methods or systems specified by the Owner and Designer. BONDS Performance and Payment Bonds (Select one only) are/ __ are not required of the Constructor. Such bonds shall be issued by a surety admitted in the State in which the Project is located and must be
OCP. Design-Builder shall provide an Owners’ and Contractors’ Protective Liability Insurance (“OCP”) policy with limits equal to the limits on CGL specified, or limits as otherwise required by Owner. Any documented additional cost in the form of a surcharge associated with procuring the additional general liability coverage in accordance with this subsection shall be paid by Owner directly or the costs may be reimbursed by Owner to Design-Builder and by increasing the GMP to correspond to the actual cost required to purchase and maintain the coverage. Prior to commencement of the Work, Design- Builder shall provide either a copy of the OCP policy, or a certificate and endorsement evidencing that Owner has been named as an additional insured, as applicable. The insurance of the Design-Builder shall be primary and non-contributory to any insurance available to the Additional Insureds
OCP. Construction Manager shall provide an Owners' and Contractors' Protective Liability Insurance (“OCP”) policy with limits equal to the limits on CGL specified, or limits as otherwise required by Owner. Any documented additional cost in the form of a surcharge associated with procuring the additional liability coverage in accordance with this subsection shall be paid by Owner directly or the costs may be reimbursed by Owner to Construction Manager by increasing the Contract Price to correspond to the actual cost required to purchase and maintain the coverage. Before commencing the Work, Construction Manager shall provide either a copy of the OCP policy, or a certificate and endorsement evidencing that Owner has been named as an additional insured, as applicable. The insurance of the Construction Manager shall be primary and non-contributory to any insurance available to the Additional Insureds.
OCP. The Grandview-Woodland Community Plan was adopted in 2016 by the City of Vancouver. The property is located in the “Hastings Hilltop” area of the GWCP.
OCP. The Construction Manager shall provide an Owners' and Contractors' Protective Liability Insurance ("OCP") policy with limits equal to the limits on CGL specified, or limits as otherwise required by the Owner.
OCP. Constructor shall provide an Owners' and Contractors' Protective Liability Insurance (“OCP”) policy with limits equal to the limits on Commercial General Liability Insurance required by Exhibit D, or limits as otherwise required by Owner. Any documented additional cost in the form of a surcharge associated with procuring the additional liability coverage in accordance with this Subparagraph shall be paid by the Owner directly or the costs may be reimbursed by Owner to Constructor by increasing the contract price to correspond to the actual cost required to purchase and maintain the additional liability coverage. Prior to commencement of the Work, Constructor shall obtain and furnish to the Owner a certificate evidencing that the additional liability coverages have been procured.
OCP. This term is defined in the first paragraph of this Agreement.
OCP. Outside Cable Plant: Part of Information Transport System running between buildings, from building to definable exterior point, between definable exterior points, or from non-City source to City building or definable exterior point. OCP includes termination punch blocks, fiber distribution panels, interior splices for outside to inside optical fiber transition, and other initial device into which outside cable attaches. OCP does not include backbone cable running between physically contiguous buildings unless cabling enters OSP pathway element (e.g. OSP conduits, maintenance holes, etc.). OCP includes underground cabling and aerial cabling.
